Update 10/29/2026: QA_10.29.2026.pdf posted to Attachments.
Project: ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1
See attachments for Request for Proposal (RFP), plans, and phyiscal data files.
THIS “TASK ORDER REQUEST FOR PROPOSAL” IS SOLELY FOR THE FOLLOWING CONTRACTS AND CONTRACTORS:
*Contract No. 69056725D000002
Contractor: ASCORP INC, DBA DEBCO CONSTRUCTION
Address: 217 College Ave. STE 5, Orofino, ID 83544
Phone: 208-476-3617
*Contract No. 69056725D000003
Contractor: GRANITE CONSTRUCTION
Address: 585 W Beach St., Watsonville, CA 95076
Phone: 360-606-1335
*Contract No. 69056725D000004
Contractor: HAMILTON CONSTRUCTION
Address: 2213 South F Street, Springfield, OR 97477
Phone: 541-746-2426
*Contract No. 69056725D000005
Contractor: M.A. DEATLEY CONSTRUCTION, INC.
Address: 829 Evans Road, Clarkston, WA 99403
Phone: 509-751-1580
*Contract No. 69056725D000006
Contractor: MJ HUGHES CONSTRUCTION, INC.
Address: 11510 NE 87TH AVE, Vancouver, WA 98662
Phone: 360-314-2024
*Contract No. 69056725D000007
Contractor: THOMPSON CONTRACTING, INC
Address: 502 Gruber Rd., Libby, MT 59923
Phone: 406-293-5392
THIS PROJECT IS BEING ADVERTISED ON SAM.GOV TO ANNOUNCE THE UPCOMING PROJECT AND ASSIST POTENTIAL SUBCONTRACTORS BY PUBLICIZING OPPORTUNITIES. A PROPOSAL WILL ONLY BE ACCEPTED FROM THE ABOVE
PRIME CONTRACTORS.
This information is also available on our website:
Idaho, Montana and Surrounding Areas MATOC:https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-and-surrounding-areas-idiq-matoc
The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp.
Construct a 0.20-mile segment of Yellowstone Trail Road including mobilization, construction survey and staking, contractor quality control and testing, construction schedule, soil erosion control, watering for dust control, roadway excavation and structure excavation for bridge with structural backfill, rock bolts and dowels, temporary roadway rockfall protection, roadway aggregate, asphalt concrete pavement with prime, blotter and tack coats, structural concrete, precast prestressed voided slabs, reinforcing steel, concrete bridge railing, dampproofing, membrane waterproofing, elastomeric bearings, reinforced shotcrete, ultra-high performance concrete, guardrail and terminal systems, signs and delineators, pavement markings, conduit and utility trench with pullboxes, turf establishment, temporary traffic control, and associated labor and equipment items.
We post new asphalt opportunities in Idaho as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""98661""VANCOUVER""WA""USA""DOT FEDERAL HIGHWAY ADMIN""610 E FIFTH STREET""QA_10.29.26.pdf"182850"file"".pdf""1""2026-10-29T23:22:18.107+00:00""63732ade085f47aba999e993e58b532f""public""0""public""822aab8a5eaf43bfb52e77a168ee1833""0"4"0""RFP_69056726R000019_ID FLAP KOOTEN 8450(1).pdf"6375807"file"".pdf""1""2026-10-13T23:16:17.527+00:00""bc34ad2d1fc84b9ea8e05dbe778155cc""public""0""public""fbfa6b1ff1924c0db6ed7a42d3d5c49d""0"3"0""ida-kooten8450-1_plans_RFP.pdf"22956816"file"".pdf""1""2026-10-13T23:16:17.527+00:00""2c7097f6e26f4890ba84b5c012d2f624""public""0""public""2befa847e5754d39874a4f3a43047865""0"2"0""Physical Data.zip"82655525"file"".zip""1""2026-10-13T23:16:17.527+00:00""eb588c4a07954c9fb898d96d30ba2fd4""public""0""public""bbcf6f25028a4f749df564494ac1c067""0"1"0""https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-and-surrounding-areas-idiq-matoc""Link to MATOC information"0"link""1""2026-10-29T23:22:18.107+00:00""c073bf5e1f714a6f9ed1ef9972d751fc""public""0""Link to MATOC information""public""4f4801684256432593152f5cc5b39fd0""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice efb33d0b6130408ab7e7a45987a1174b), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.