THE NEW YORK POWER AUTHORITY (HEREAFTER, THE "AUTHORITY" OR "NYPA") INVITES YOU TO SUBMIT A PROPOSAL FOR ALBANY GSD LANDFILL SOLAR Solar PV PROJECT EPC SERVICES AS SET FORTH IN THE SCOPE OF WORK/TECHNICAL SPECIFICATIONS LOCATED IN THE RFP.
FIRMS/ENTITIES ARE HEREBY DIRECTED TO MAKE USE OF THE NEW YORK POWER AUTHORITY'S WEBSITE AT WWW.NYPA.GOV IN ORDER TO OBTAIN INSTRUCTIONS ON PARTICIPATING IN SUBMITTING COMPANY INFORMATION THROUGH ARIBA. COMMENSURATE EXPERIENCE IS REQUIRED FOR THIS PROJECT. FURTHER DETAILS ON QUALIFICATIONS/REQUIREMENTS CAN BE FOUND IN THE SCOPE OF WORK.
MBE: 15
WBE: 15
SDVOB: 3
The contractor shall provide all work required to deliver a commercially operational solar PV system, including engineering, design, procurement, delivery, installation, construction, commissioning, start-up, and testing. The scope includes solar modules (owner-supplied), DC and AC electrical power systems, inverter stations, interconnection equipment, PV array data acquisition system, site communication infrastructure, meteorological stations, auxiliary and essential power supply systems, labels, structural racking with ballasted foundations, foundations for equipment, mechanical systems, raceway, power and instrument cable, instrument cabinets, site grounding and lightning protection, site development, clearing, tree relocation, fencing, landscaping, storm water and erosion control, site restoration, roads and work pads, parking lot repair, environmental control plan, construction power and support facilities, construction security, project administration, equipment management, site management, procurement, construction and contractor permits, owner permits (environmental and building), onsite utility coordination, engineering and design including as-builts, project document preparation, electrical studies, utility and topographic surveys, PVsyst energy production model, quality program, O&M manuals, training, start-up and commissioning, and coordination of interconnection with the utility.
We post new electrical opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most New York work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.