Clark County invites qualified firms or individuals to submit bids. Questions regarding this bid must be directed to the Bid Contact listed in this bid.
The work will generally consist of improvements on Las Vegas Boulevard from Flamingo Road to Spring Mountain Road for a length of approximately one mile. The project includes cold planing, plantmix bituminous surface, UTACS, pedestrian protection device installation, curb and gutter reconstruction, sidewalk, sidewalk reconstruction/widening, sidewalk ramps, median reconstruction, bus turnouts, street lights and Smart poles, LED landscape lighting conversion, landscaping/irrigation modifications, traffic signal modifications at 6 intersections, utility adjustments, storm sewer facilities, pavement markings, signing, power and communication system installation and connection to new Smart poles. The work also includes a installation of a new waterline for the entire project length along Las Vegas Boulevard to replace an existing waterline for the Las Vegas Valley Water District.
The Work also includes improvements to Flamingo Road from I-15 to Koval Lane, for a length of approximately three quarters of a mile. The Work will generally consist of improvements including curb and gutter, removing and replacing damaged sidewalk for Americans with Disabilities Act (ADA) current standards, traffic signal modifications including detector loop installation, utility adjustments, cold planing, plantmix bituminous surface, UTACS, storm drain installation, permanent striping and signing, and street lighting LED luminaires.
The Las Vegas Boulevard portion covers approximately one mile and includes cold planing, plantmix bituminous surface, UTACS, pedestrian protection device installation, curb and gutter reconstruction, sidewalk, sidewalk reconstruction/widening, sidewalk ramps, median reconstruction, bus turnouts, street lights and Smart poles, LED landscape lighting conversion, landscaping/irrigation modifications, traffic signal modifications at 6 intersections, utility adjustments, storm sewer facilities, pavement markings, signing, and power and communication system installation and connection to new Smart poles, plus installation of a new waterline for the entire project length to replace an existing waterline for the Las Vegas Valley Water District. The Flamingo Road portion from I-15 to Koval Lane covers approximately three quarters of a mile and includes curb and gutter, removing and replacing damaged sidewalk to current ADA standards, traffic signal modifications including detector loop installation, utility adjustments, cold planing, plantmix bituminous surface, UTACS, storm drain installation, permanent striping and signing, and street lighting LED luminaires.
We post new asphalt opportunities in Nevada as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s notice text — each row shows the sentence it came from. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Clark County, Nevada (solicitation 20807), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.