The City of Los Angeles, Bureau of Engineering (BOE), Geotechnical Engineering Division (GED) is seeking a consultant to review existing geotechnical reports and other relevant available Information; prepare a health & safety plan; geophysical investigation; geotechnical field exploration including drilling/logging/sampling hollow stem auger borings and borehole infiltration tests; geotechnical laboratory testing;
geotechnical investigation report; environmental soil sampling including drilling/logging/sampling hollow stem auger borings; analytical laboratory testing; and limited Phase II Environmental Site Assessment report.
Consultants will not be required to obtain permits.
*Any subconsultants that have been added to the contract and not originally a part of Schedule A must be registered with RAMP.
**This TOS is only applicable to the top three firms on the Pre-Qualified On-Call Geotechnical and Environmental Engineering Services Consultants List — Verdantas, Inc., Geosyntec Consultants, and Fugro USA Land, Inc.
The consultant will review existing geotechnical reports and other relevant available information; prepare a health & safety plan; conduct geophysical investigation; perform geotechnical field exploration including drilling/logging/sampling hollow stem auger borings and borehole infiltration tests; conduct geotechnical laboratory testing; prepare a geotechnical investigation report; perform environmental soil sampling including drilling/logging/sampling hollow stem auger borings; conduct analytical laboratory testing; and prepare a limited Phase II Environmental Site Assessment report.
We post new professional & consulting services opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.