Completion Dates: Construction: September 15, 2027 Seeding: November 30, 2027 (Structure and Buffer Seedings must follow the seeding period stipulated in the Technical Specifications) This project is for a nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, tied concrete block mat installation, tile installation, water control structure, riprap, and seeding. This project includes about 11,500 cubic yards of excavation, 12,700 cy of earthfill, installation of 14,800 square feet of tied concrete block mat, two water control structure installations, 4650 linear feet (LF) of tile installation, 220 tons of riprap installation in various sizes, and 14.4 acres of seeding.
The estimated construction cost range for this project is $400,00 to $450,000.
The work builds a nutrient reduction wetland with selective clearing, excavation and grading, about 11,500 cubic yards of excavation and 12,700 cy of earthfill, installation of 14,800 square feet of tied concrete block mat, two water control structures, 4650 linear feet of tile, 220 tons of riprap in various sizes, and 14.4 acres of structure and buffer seeding, plus mobilization, topsoil respreading, pipe, outlets, geotextile and mulch blanket.
We post new excavating opportunities in Iowa as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Iowa DAS Procurement (bid 26-20 Gru891821B (Grundy)), retrieved via Iowa Department of Administrative Services. View the official posting, and always confirm requirements and deadlines with the issuing agency.