Completion Dates: Construction: November 1st, 2027 Seeding: December 15, 2027 (must follow the seeding period) This project is for a traditional breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheetpile installation, tile installation, water control structure and seeding. This project includes about 62,120 cubic yards of earthwork, installation of 1,044 square feet of steel sheetpile, Aluminum CMP water control structure, 814 linear feet (LF) of tile installation, 57 LF of Aluminum CMP drawdown pipe, 2 Aluminum CMP inlet risers, 618 tons of riprap, 104 cubic yards of concrete grout and 23.1 acres of seeding.
The estimated construction cost range for this project is $475,000 to $575,000.
The contractor will perform selective clearing, excavation and grading to create a wetland pool, sedimentation basins and berm, install 1,044 square feet of steel sheet piling for the primary weir, modify subsurface drainage tile and install new tile, install an aluminum CMP water control structure with drawdown pipe and inlet risers and a stilling basin, place riprap with concrete grout, and complete structure and buffer seeding and restoration.
We post new excavating opportunities in Iowa as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Iowa work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Iowa DAS Procurement (bid 26-21 Gre853129D (Greene)), retrieved via Iowa Department of Administrative Services. View the official posting, and always confirm requirements and deadlines with the issuing agency.