Completion Dates: Construction November 1st, 2027 Seeding December 15, 2027 (must follow seeding dates stipulated in the Specifications) In general, the work includes constructing a wetland that will treat the water from an existing ditch using a solar panel powered pump. The project includes, but is not limited to, selective clearing, excavation and grading, along with tile and outlet structures, lift station with solar-powered pump, tile installation, riprap placement, and seeding. This project includes around 7,800 total cubic yards of earthwork, 726 linear feet of pipe installation, 67 tons of rock, 140 tons of trench stabilization material, installation of a Modified SW-401 concrete outlet structure, two-chamber water control structure, lift station with pump assembly and solar panels, 738 LF of straw wattle and 4.9 acres of seeding.
The estimated construction cost range for this project is $175,000 to $275,000.
The contractor provides supervision, labor, materials and equipment to build a nutrient reduction wetland including selective clearing, excavation and grading, tile investigation, removal and connections, HDPE and RCP pipe, a Modified SW-401 outlet structure, a 60-inch lift station with solar-powered pump assembly, water control structures, CMP culvert, riprap and roadstone, trench stabilization, straw wattle, mobilization, topsoil placement, and buffer and structure seeding.
We post new electrical opportunities in Iowa as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Iowa DAS Procurement (bid 26-19 Sac883604A (Sac)), retrieved via Iowa Department of Administrative Services. View the official posting, and always confirm requirements and deadlines with the issuing agency.