Bridge replacement for SN 091-0003 and 091-0004 at the Dongola Interchange on I-57 over Cypress Road at Big Creek, 0.2 miles east of Dongola.
Item: 128
Contract: 78A26
Region/District: 5 / 9
DBE goal: Pending%
VBP goal: Pending%
Federal Project: BR8D47(696)
Key Routes: FAI 57
Marked Routes: I-57
Sections: (91-4HB-1)B-1
State Jobs: C-99-018-24
Contract specifics:
Replace two existing structures at the Dongola Interchange on I-57 over Cypress Road at Big Creek, including removal of existing structures, structure excavation, concrete structures and concrete superstructure, furnishing and erecting structural steel with stud shear connectors, epoxy-coated reinforcement bars, furnishing and driving steel HP12X84 piles with test piles and pile shoes, temporary sheet piling and soil retention, full-depth precast bridge approach slabs, slope wall, guardrail and traffic barrier terminals, pavement, shoulders and rumble strips, pipe drains and underdrains, pavement markings, erosion control and seeding, traffic control and protection with detour signing, mobilization, construction layout, and engineer's field office.
We post new structural work opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 78A26), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.