Bridge superstructure replacement, bridge bearing replacement, bridge joint replacement, drainage improvements and slopewall removal and replacement on SN 001-0050 and SN 001-0051 carrying I-172 over the Burlington Northern Santa Fe Railroad, 1.5 miles south of US 24.
Item: 081
Contract: 72250
Region/District: 4 / 6
DBE goal: Pending%
VBP goal: Pending%
Federal Project: BRPB9I(996)
Key Routes: FAI 172
Marked Routes: I-172
Sections: 1-6VBR
State Jobs: C-96-036-23
Contract specifics:
Replace superstructures on SN 001-0050 and SN 001-0051 carrying I-172, including removal of existing superstructures, concrete removal and structure excavation, concrete structures and concrete superstructure, structural steel, stainless and epoxy-coated reinforcement, elastomeric bearings, anchor bolts, preformed joint strip seal, precast bridge approach slabs, slopewall removal and replacement, riprap, pipe drains and underdrains, inlets and culverts, earthwork, paving, shoulders, guardrail, pavement marking, traffic control and railroad protective liability insurance.
We post new structural work opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 72250), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.