Construction of a single span PPC deck beam bridge carrying Farrell Rd. over Spring Creek in the city of Joliet. Additional work includes full-depth HMA pavement reconstruction, pipe culverts, guardrail and other required work.
Item: 025
Contract: 61M06
Region/District: 1 / 1
DBE goal: Pending%
VBP goal: Pending%
Federal Project: UUU5(053)
Key Routes: FAU 366
Marked Routes: FARRELL ROAD
Sections: 21-00542-00-BR (JOLIET)
State Jobs: C-91-202-24
Contract specifics:
Construction of a single-span PPC deck beam bridge over Spring Creek, including full-depth HMA pavement reconstruction, pipe culverts, guardrail, tree removal, earth and channel excavation, trench backfill, geotechnical fabric, topsoil, seeding, erosion control, stone riprap, aggregate subgrade improvement, hot-mix asphalt binder and surface courses, pavement removal, structure excavation, concrete structures, precast prestressed concrete deck beams, reinforcement bars, steel piles, pipe culverts, waterproofing membrane, guardrail, traffic control, and mobilization.
We post new asphalt opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 61M06), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.