CONTRACTS AND SPECIFICATIONS BUREAU
Proposal
Proposal ID: 94-2690-631 Letting Date: October 20, 2026
Call Order: 015
Proposal Work Type: BRIDGE REPLACEMENT - OTHER
DBE Goal: 0.0%
Contracting Authority: CITY OF FORT DODGE
Proposal Guaranty: $150,000.00
This proposal includes the following project(s):
Project Number: BROS-2690(631)--8J-94 County: WEBSTER
Project Work Type: BRIDGE REPLACEMENT - OTHER Route: 19TH ST.
Location: In the city of Fort Dodge, On S 19TH STREET, Over UP RR, S29 T89N R28W
Road System: URBAN
Federal Aid - Wages: Federal Aid - Predetermined Wages are in Effect
Contracts and Specifications Bureau
9/8/2026 1:05 PM
Contract Time
Proposal ID: 94-2690-631 Call Order: 015 Letting Date: October 20, 2026
Site ID Site Details Liquidated
Damages
00 Late Start Date 05/31/2027 100 WORK DAYS $1,200.00
.
(*) - Indicates Cost Plus Time Site. See Schedule of Items for Cost Per Unit
Contracts and Specifications Bureau
9/8/2026 1:05 PM
Proposal ID: 94-2690-631 Call Order: 015 Letting Date: October 20, 2026
Notes
Notes :
There are no notes for this proposal.
Contracts and Specifications Bureau
9/8/2026 1:05 PM
Proposal Specifications List
Proposal ID: 94-2690-631 Call Order: 015 Letting Date: October 20, 2026
Note Description
001.2023 *** STANDARD SPECIFICATIONS -- SERIES 2023 ***
The Iowa Department of Transportation STANDARD SPECIFICATIONS FOR
HIGHWAY AND BRIDGE CONSTRUCTION, SERIES 2023, plus applicable General
Supplemental Specifications, Developmental Specifications, Supplemental
Specifications AND Special Provisions shall apply to construction work on this contract.
Contracts and Specifications Bureau
9/8/2026 1:05 PM
Proposal Specifications List
Proposal ID: 94-2690-631 Call Order: 015 Letting Date: October 20, 2026
Note Description
005.1107.02 *** Revisions to Article 1107.02 ***
Article 1107.02, Insurance, is amended by the following modifications and additions.
This proposal note becomes null and void January 1, 2027.
A. It shall be the Contractor's responsibility to have liability insurance covering all
of the construction operations incident to contract completion and the Contractor must
have on file with the Contracting Authority a current "Certificate of Insurance" prior to
award of contract. The certificate shall identify the insurance company firm name and
address, Contractor firm name, policy period, type of policy, limits of coverage, and
scope of work covered (single contract or statewide). This requirement shall apply with
equal force, whether the work is performed by persons employed directly by the
Contractor including a subcontractor, persons employed by a subcontractor, or by an
independent contractor.
B. In addition to the above, the Contracting Authority shall be included as an
insured party, or a separate owner's protective policy shall be filed showing the
Contracting Authority as an insured party.
C. The liability insurance shall be written by an insurance company (or
companies) qualified to do business in Iowa. For independent contractors engaged
solely in the transportation of materials, the minimum coverage provided by such
insurance shall be not less than that required by Chapter 325A, Code of Iowa, for such
truck operators or contract carriers as defined therein. For all other contractors,
subcontractors, independent contractors, and the Contracting Authority, the minimum
coverage by such insurance shall be as follows:
General Liability, Including: BODILY INJURY
Independent Contractors $500,000 Each Occurrence
Contractual Liability, $500,000 Aggregate
Products and Completed PROPERTY DAMAGE
Operations $250,000 Each Occurrence
$250,000 Aggregate
or
BODILY INJURY AND PROPERTY DAMAGE
- COMBINED SINGLE LIMIT*
$750,000 Each Occurrence
$750,000 Aggregate
*A comprehensive Catastrophe Liability Policy (Umbrella) can be used to aid in
achieving the minimum required limits.
Contracts and Specifications Bureau
9/8/2026 1:05 PM
Proposal Specifications List
Proposal ID: 94-2690-631 Call Order: 015 Letting Date: October 20, 2026
Note Description
*A comprehensive Catastrophe Liability Policy (Umbrella) can be used to aid in
achieving the minimum required limits.
D. Failure on the part of the Contractor to comply with the requirements of this
article will be considered sufficient cause to suspend the work, withhold estimates, and
to deny the Contractor from receiving further contract awards, as provided in Article
1103.01.
410.11 *** STORM WATER POLLUTION PREVENTION PLAN ***
A Storm Water Pollution Prevention Plan has been developed by the Contracting
Authority for one or more projects on this contract. See the project plans (or other
contract document) for specific Storm Water Pollution Prevention Plan details.
500.01 *** WINTER WORK ***
The free time allowed between November 15 and April 1 will not be permitted on this
project. The Contractor shall work during the winter on all working days as defined in
Article 1101.03 'Working Day'.
DS-23023 DEVELOPMENTAL SPECIFICATIONS FOR GIRDER ERECTION PLAN
DS-23081 DEVELOPMENTAL SPECIFICATIONS FOR CONSTRUCTION OR MAINTENANCE
WORK ON RAILROAD RIGHT-OF-WAY (UNION PACIFIC RAILROAD)
DS-23082 DEVELOPMENTAL SPECIFICATIONS FOR HIGH PERFORMANCE CONCRETE
FOR STRUCTURES
FHWA-1273.09 FHWA-1273: REQUIRED CONTRACT PROVISIONS FEDERAL-AID
CONSTRUCTION CONTRACTS -- REVISED OCTOBER 23, 2023
23 U.S.C. 133(i) requires application of Davis Bacon predetermined wages on certain
projects on roads functionally classified as a local road or a rural minor collector. This
supersedes the applicability described in FHWA-1273 Section IV.
GS-23007 GENERAL SUPPLEMENTAL SPECIFICATIONS FOR HIGHWAY AND BRIDGE
CONSTRUCTION, OCTOBER 20, 2026 RELEASE
Contracts and Specifications Bureau
9/8/2026 1:05 PM
Proposal Specifications List
Proposal ID: 94-2690-631 Call Order: 015 Letting Date: October 20, 2026
Note Description
IA26-28.4A PREDETERMINED WAGE RATE - GENERAL DECISION NUMBER IA20260028
FOR HEAVY AND HIGHWAY CONSTRUCTION -- STATEWIDE (EXCEPT SCOTT
COUNTY)
Note: The Contractor shall review the contract documents and
is responsible for identifying which zone(s), as defined
in the Predetermined Wage Rate specification, apply to
the work on the contract.
*** Additional Requirement ***
Contracts where the Department is the Contracting Authority:
The Prime Contractor and each approved Subcontractor shall submit certified payrolls
weekly to the Project Engineer. Each Contractor shall use the AASHTOWare Project
Civil Rights and Labor (AWP CRL) software to electronically submit Certified Payroll
Reports. The Contractor shall list the craft for each employee covered by the
Predetermined Wage Rates. The Prime Contractor shall review and approve each
Subcontractor’s payroll within AWP CRL.
Contracts where the Department is not the Contracting Authority:
The Prime Contractor shall submit certified payrolls for itself and each approved
Subcontractor weekly to the Project Engineer. The Contractor may use the Iowa D.O.T.
Certified Payroll form or other approved form. The Contractor shall list the craft for
each employee covered by the Predetermined Wage Rates. The Prime Contractor
shall sign each of the Subcontractor's payrolls to acknowledge the submittal of the
Certified Payroll.
Contracts and Specifications Bureau
9/8/2026 1:05 PM
Proposal Schedule of Items
Proposal ID: 94-2690-631 Call Order: 015 Letting Date: October 20, 2026
SECTION: 0001
ITEMS FOR A 144'-0 X 32'-0 ROLLED STEEL BEAM BRIDGE WITH A 10'-0 SIDEWALK
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0010 2101-0850001 0.180
CLEARING AND GRUBBING ACRE _________._____ _________._____
0020 2102-0425070 466.000
SPECIAL BACKFILL TON _________._____ _________._____
0030 2102-2625000 1,054.000
EMBANKMENT-IN-PLACE CY _________._____ _________._____
0040 2102-2710070 303.000
EXCAVATION, CLASS 10, ROADWAY
AND BORROW
CY _________._____ _________._____
0050 2102-2713090 275.800
EXCAVATION, CLASS 13, WASTE CY _________._____ _________._____
0060 2105-8425015 175.000
TOPSOIL, STRIP, SALVAGE AND
SPREAD
CY _________._____ _________._____
0070 2123-7450000 9.000
SHOULDER CONSTRUCTION, EARTH STA _________._____ _________._____
0080 2301-0685550 545.700
BRIDGE APPROACH PAVEMENT, AS
PER PLAN
SY _________._____ _________._____
0090 2301-1033080 1,314.200
STANDARD OR SLIP FORM
PORTLAND CEMENT CONCRETE
PAVEMENT, CLASS C, CLASS 3
DURABILITY, 8 IN.
SY _________._____ _________._____
0100 2315-8275030 30.200
SURFACING, DRIVEWAY, CLASS C
GRAVEL
TON _________._____ _________._____
0110 2401-6745625
REMOVAL OF EXISTING BRIDGE LUMP SUM LUMP SUM _________._____
Contracts and Specifications Bureau
9/8/2026 1:05 PM
Proposal Schedule of Items
Proposal ID: 94-2690-631 Call Order: 015 Letting Date: October 20, 2026
SECTION: 0001
ITEMS FOR A 144'-0 X 32'-0 ROLLED STEEL BEAM BRIDGE WITH A 10'-0 SIDEWALK
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0120 2402-0425030 320.000
GRANULAR BACKFILL CY _________._____ _________._____
0130 2402-2720000 620.000
EXCAVATION, CLASS 20 CY _________._____ _________._____
0140 2403-0100000 85.200
STRUCTURAL CONCRETE
(MISCELLANEOUS)
CY _________._____ _________._____
0150 2403-0100010 282.800
STRUCTURAL CONCRETE (BRIDGE) CY _________._____ _________._____
0160 2403-7000210 247.600
HIGH PERFORMANCE STRUCTURAL
CONCRETE
CY _________._____ _________._____
0170 2404-7775000 31,084.000
REINFORCING STEEL LB _________._____ _________._____
0180 2404-7775005 96,823.000
REINFORCING STEEL, EPOXY
COATED
LB _________._____ _________._____
0190 2404-7775009 68.000
REINFORCING STEEL, STAINLESS
STEEL
LB _________._____ _________._____
0200 2408-7800000 113,909.000
STRUCTURAL STEEL LB _________._____ _________._____
0210 2408-8000000
GIRDER ERECTION PLAN LUMP SUM LUMP SUM _________._____
0220 2412-0000100 1,179.900
LONGITUDINAL GROOVING IN
CONCRETE, BRIDGE DECK AND/OR
APPROACHES
SY _________._____ _________._____
0230 2414-6424110 322.000
CONCRETE BARRIER RAILING LF _________._____ _________._____
Contracts and Specifications Bureau
9/8/2026 1:05 PM
Proposal Schedule of Items
Proposal ID: 94-2690-631 Call Order: 015 Letting Date: October 20, 2026
SECTION: 0001
ITEMS FOR A 144'-0 X 32'-0 ROLLED STEEL BEAM BRIDGE WITH A 10'-0 SIDEWALK
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0240 2414-6444100 150.000
STEEL PIPE PEDESTRIAN HAND
RAILING
LF _________._____ _________._____
0250 2435-0250100 3.000
INTAKE, SW-501 EACH _________._____ _________._____
0260 2435-0600020 2.000
MANHOLE ADJUSTMENT, MAJOR EACH _________._____ _________._____
0270 2501-0201057 4,560.000
PILES, STEEL, HP 10 X 57 LF _________._____ _________._____
0280 2501-6335010 160.000
PREBORED HOLES LF _________._____ _________._____
0290 2502-8212204 185.000
SUBDRAIN, PERFORATED PLASTIC
PIPE, 4 IN. DIA.
LF _________._____ _________._____
0300 2502-8221303 1.000
SUBDRAIN OUTLET, DR-303 EACH _________._____ _________._____
0310 2503-0114215 67.000
STORM SEWER GRAVITY MAIN,
TRENCHED, REINFORCED
CONCRETE PIPE (RCP), 2000D
(CLASS III), 15 IN.
LF _________._____ _________._____
0320 2503-0200036 67.000
REMOVE STORM SEWER PIPE LESS
THAN OR EQUAL TO 36 IN.
LF _________._____ _________._____
0330 2507-2638620 1,240.000
MACADAM STONE SLOPE
PROTECTION
SY _________._____ _________._____
0340 2507-2638660 16.000
BRIDGE WING ARMORING -
MACADAM STONE
SY _________._____ _________._____
Contracts and Specifications Bureau
9/8/2026 1:05 PM
Proposal Schedule of Items
Proposal ID: 94-2690-631 Call Order: 015 Letting Date: October 20, 2026
SECTION: 0001
ITEMS FOR A 144'-0 X 32'-0 ROLLED STEEL BEAM BRIDGE WITH A 10'-0 SIDEWALK
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0350 2507-3250005 73.000
ENGINEERING FABRIC SY _________._____ _________._____
0360 2510-6745850 1,655.100
REMOVAL OF PAVEMENT SY _________._____ _________._____
0370 2510-6750600 3.000
REMOVAL OF INTAKES AND UTILITY
ACCESSES
EACH _________._____ _________._____
0380 2511-6745900 217.300
REMOVAL OF SIDEWALK SY _________._____ _________._____
0390 2511-7526004 160.700
SIDEWALK, P.C. CONCRETE, 4 IN. SY _________._____ _________._____
0400 2511-7526006 130.500
SIDEWALK, P.C. CONCRETE, 6 IN. SY _________._____ _________._____
0410 2511-7528101 81.200
DETECTABLE WARNINGS SF _________._____ _________._____
0420 2515-2475006 180.900
DRIVEWAY, P.C. CONCRETE, 6 IN. SY _________._____ _________._____
0430 2519-1001000 409.000
FENCE, CHAIN LINK, VINYL COATED LF _________._____ _________._____
0440 2519-1002048 200.000
FENCE, CHAIN LINK, 48 IN. HEIGHT LF _________._____ _________._____
0450 2519-4200090 30.000
REMOVAL AND REINSTALLATION OF
FENCE, WOOD
LF _________._____ _________._____
0460 2519-4200120 160.000
REMOVAL OF FENCE, CHAIN LINK LF _________._____ _________._____
0470 2520-3350015 1.000
FIELD OFFICE EACH _________._____ _________._____
Contracts and Specifications Bureau
9/8/2026 1:05 PM
Proposal Schedule of Items
Proposal ID: 94-2690-631 Call Order: 015 Letting Date: October 20, 2026
SECTION: 0001
ITEMS FOR A 144'-0 X 32'-0 ROLLED STEEL BEAM BRIDGE WITH A 10'-0 SIDEWALK
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0480 2524-6765010 3.000
REMOVE AND REINSTALL SIGN AS
PER PLAN
EACH _________._____ _________._____
0490 2524-6765110 1.000
REMOVAL OF TYPE A SIGN EACH _________._____ _________._____
0500 2526-8285010
CONSTRUCTION SURVEY,
MONUMENT PRESERVATION
LUMP SUM LUMP SUM _________._____
0510 2526-8285020
CONSTRUCTION SURVEY, CONTROL
POINT SURVEY
LUMP SUM LUMP SUM _________._____
0520 2526-8285030
CONSTRUCTION SURVEY, RIGHT OF
WAY
LUMP SUM LUMP SUM _________._____
0530 2526-8285040
CONSTRUCTION SURVEY, LOCATION
SURVEY
LUMP SUM LUMP SUM _________._____
0540 2528-2518000 5.000
SAFETY CLOSURE EACH _________._____ _________._____
0550 2528-8445110
TRAFFIC CONTROL LUMP SUM LUMP SUM _________._____
0560 2533-4980005
MOBILIZATION LUMP SUM LUMP SUM _________._____
0570 2595-0005150
RAILROAD PROTECTIVE LIABILITY
INSURANCE FOR UNION PACIFIC
RAILROAD CO.
LUMP SUM LUMP SUM _________._____
0580 2601-2634105 1.000
MULCHING, BONDED FIBER MATRIX ACRE _________._____ _________._____
Contracts and Specifications Bureau
9/8/2026 1:05 PM
Proposal Schedule of Items
Proposal ID: 94-2690-631 Call Order: 015 Letting Date: October 20, 2026
SECTION: 0001
ITEMS FOR A 144'-0 X 32'-0 ROLLED STEEL BEAM BRIDGE WITH A 10'-0 SIDEWALK
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0590 2601-2636044 0.500
SEEDING AND FERTILIZING (URBAN) ACRE _________._____ _________._____
0600 2601-2642120 0.500
STABILIZING CROP - SEEDING AND
FERTILIZING (URBAN)
ACRE _________._____ _________._____
0610 2602-0000020 325.000
SILT FENCE LF _________._____ _________._____
0620 2602-0000071 325.000
REMOVAL OF SILT FENCE OR SILT
FENCE FOR DITCH CHECKS
LF _________._____ _________._____
0630 2602-0000101 325.000
MAINTENANCE OF SILT FENCE OR
SILT FENCE FOR DITCH CHECK
LF _________._____ _________._____
0640 2602-0000312 870.000
PERIMETER AND SLOPE SEDIMENT
CONTROL DEVICE, 12 IN. DIA.
LF _________._____ _________._____
0650 2602-0000320 20.000
PERIMETER AND SLOPE SEDIMENT
CONTROL DEVICE, 20 IN. DIA.
LF _________._____ _________._____
0660 2602-0000351 890.000
REMOVAL OF PERIMETER AND
SLOPE OR DITCH CHECK SEDIMENT
CONTROL DEVICE
LF _________._____ _________._____
0670 2602-0000500 24.000
OPEN-THROAT CURB INTAKE
SEDIMENT FILTER, EC-602
LF _________._____ _________._____
0680 2602-0000510 2.000
MAINTENANCE OF OPEN-THROAT
CURB INTAKE SEDIMENT FILTER
EACH _________._____ _________._____
0690 2602-0000520 2.000
REMOVAL OF OPEN-THROAT CURB
INTAKE SEDIMENT FILTER
EACH _________._____ _________._____
Contracts and Specifications Bureau
9/8/2026 1:05 PM
Proposal Schedule of Items
Proposal ID: 94-2690-631 Call Order: 015 Letting Date: October 20, 2026
SECTION: 0001
ITEMS FOR A 144'-0 X 32'-0 ROLLED STEEL BEAM BRIDGE WITH A 10'-0 SIDEWALK
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0700 2602-0000530 1.000
GRATE INTAKE SEDIMENT FILTER
BAG, EC-604
EACH _________._____ _________._____
0710 2602-0000540 1.000
MAINTENANCE OF GRATE INTAKE
SEDIMENT FILTER BAG
EACH _________._____ _________._____
0720 2602-0000550 1.000
REMOVAL OF GRATE INTAKE
SEDIMENT FILTER BAG
EACH _________._____ _________._____
0730 2602-0010010 1.000
MOBILIZATIONS, EROSION CONTROL EACH 600.00000 600.00
0740 2602-0010020 1.000
MOBILIZATIONS, EMERGENCY
EROSION CONTROL
EACH 1,200.00000 1,200.00
Section: 0001 Total: _________._____
Total Bid: _________._____
DS-23023
(New)
DEVELOPMENTAL SPECIFICATIONS
FOR
GIRDER ERECTION PLAN
Effective Date
October 17, 2023
THE STANDARD SPECIFICATIONS, SERIES 2023, ARE AMENDED BY THE FOLLOWING
MODIFICATIONS AND ADDITIONS. THESE ARE DEVELOPMENTAL SPECIFICATIONS AND THEY
SHALL PREVAIL OVER THOSE PUBLISHED IN THE STANDARD SPECIFICATIONS.
23023.01 DESCRIPTION.
This work shall consist of developing, engineering and submitting a detailed Girder Erection Plan which shall
include erection plans and procedures substantiated with appropriate erection engineering calculations.
23023.02 CERTIFICATION.
The Girder Erection Plan submittal consisting of erection plans and procedures shall be certified by a
Professional Engineer licensed in the State of Iowa, known in this document as the Erection Engineer.
Erection engineering calculations used in the preparation of the Girder Erection Plan shall only be
submitted if requested by the Engineer. If the Engineer requests erection engineering calculations, they
shall be submitted with the certification of the Erection Engineer.
23023.03 DETAILS OF GIRDER ERECTION PLAN SUBMITTAL.
A. Review.
The Engineer shall be allowed a minimum of 30 working days to review the submittal. The
Engineer shall provide notification to the Contractor either indicating “No Exceptions Taken” or
“Revise and Resubmit”.
B. Erection Plans and Procedures Overview.
1. The term “erection plans” refers specifically to the engineering drawings prepared by the
Erection Engineer describing and specifying the erection (i.e., the field-installation and
member-placement) of the structural steel. Erection Plans may also refer in a more general
context to the combination of engineering drawings and erection procedures describing and
specifying the erection (i.e., the field-installation and member-placement) of the structural
steel.
2. The term “erection procedures” refers to the documents which describe the specific
sequence, methods, equipment, and other directives that the Contractor is to follow in
erecting the structural steel. The terms “erection plans” and “erection procedures” are not
synonymous, but the erection plans and erection procedures shall be fully integrated with
each other and shall together describe and specify all aspects of how the structural steel is to
DS-23023, Page 2 of 5
be erected, including, but not limited to, sequence of erection, methods or techniques to be
used, equipment to be used, and materials to be used along with any temporary works or
other devices necessary.
3. The erection plans and procedures shall address all requirements for erection of the
structural steel into the final designed configuration. Any and all written review comments
provided by the Engineer shall be addressed to the Engineer’s satisfaction prior to the start of
erection. As a minimum, the erection plans and procedures shall include consideration of all
items described in Article D below.
C. Erection Engineering Calculations.
1. Appropriate erection engineering calculations to substantiate the structural adequacy and
stability of the bridge system for each step of the steel erection shall be performed to
substantiate the erection plans and procedures.
2. At a minimum and as appropriate, erection engineering calculations shall conform to the
following guide specifications:
• Guide Design Specifications for Bridge Temporary Works, AASHTO, 2nd Edition, 2017
• Guide Specifications for Wind Loads on Bridges During Construction, AASHTO, 1st
Edition, 2017
3. Erection engineering calculations to substantiate the structural adequacy and stability of the
erected structure and any associated temporary works and/or temporary components do not
need to be included in the Girder Erection Plan submittal. However, the Engineer reserves
the right to request the submittal of erection engineering calculations for review and approval
at any time. If requested, such calculations shall be submitted within 14 calendar days of
request by the Engineer.
D. Erection Plans and Procedures.
1. Plan of Work Area.
The erection plan shall include:
• A plan of the work area showing the proposed bridge,
• The permanent support structures (piers and abutments),
• Roads,
• Railroad tracks,
• Waterways (including location and dimensions of any navigational channel(s) and any
navigational clearances which must be respected during construction),
• Overhead and underground utilities,
• Structures and conditions that may limit access (consideration of clearance requirements
over roadways or railroads),
• Staging or material storage areas,
• Right-of-way and property lines,
• Information, plans, etc. regarding maintenance of traffic requirements, lane or road
closures, restrictions, durations, etc. necessary to protect public safety for all erection
operations over or adjacent to live traffic, and
• Any other information that may be pertinent to the steel erection.
2. Erection Sequence.
The erection plans and procedures shall indicate the erection sequence for all primary
members (including indication of any attached secondary members), noting the use of
temporary support conditions, such as holding crane positions, temporary supports,
DS-23023, Page 3 of 5
falsework, etc. The erection sequence shall be shown in an illustrative plan view of the bridge
for each erection stage, highlighting the structural components to be erected, their weights
and center of gravity locations, lifting crane locations for primary member picks, and any
temporary support conditions that are necessary during the particular stage. The illustrative
plan view shall be accompanied with a written narrative of the procedure to be followed by
the steel erector, which shall state items such as structural components to be erected, use of
temporary supports, use of temporary bracing, hold cranes, etc. Member reference marks,
when reflected on the erection plans and procedures, should be the same as used on shop
detail drawings.
3. Delivery Location.
The submittal shall indicate the delivery location and orientation of all primary members.
4. Crane Information.
a. The erection plans and procedures shall show the location of each crane to be used for
each primary member to pick (see Article 23023.03, D, 2), the crane type, crane pick
radius, crane support methods (crane mats, barges, work trestles, etc.), and the means
of attachment to the girders being lifted or supported.
b. The erection submittal shall include capacity charts or tables that address and
demonstrate the adequacy of each crane configuration, boom length, counterweight
configuration, outrigger configuration, and pick weight required to do the proposed work.
The erection plans and procedures shall also indicate any potential above- or below-
ground obstructions or restrictions to crane operations (such as existing structures,
utilities, etc.).
c. In the event that the submitted cranes are not available at the time of construction, the
Contractor can propose alternate cranes, subject to review and approval by the Engineer.
The submittal package for alternate cranes shall include capacity charts or tables that
address and demonstrate the adequacy of each crane configuration, boom length,
counterweight configuration, outrigger configuration, and pick weight required to do the
proposed work; however, resubmittal of the full Girder Erection Plan is not required.
d. Any plans associated with crane supports (such as crane mats, barges, work trestles,
etc.) shall also be included. When applicable, manufacturers’ certification documents or
catalog cuts for pre-engineered devices or equipment may be used to meet this
requirement; these items shall be included in the submittal and shall be subject to review
and approval by the Engineer. Calculations for crane supports (crane mats, barges, work
trestles, etc.) do not need to be included in the submittal, but the Engineer reserves the
right to request their submittal for review and approval at any time. If requested, such
calculations shall be submitted within 14 calendar days of request by the Engineer.
5. Primary Member Crane Pick Information.
The submittal shall include the lifting weight of the primary member picks, including all rigging
and pre-attached elements (such as cross-frames or splice plates). It shall also include the
approximate center of gravity locations for the primary member picks of non-symmetric
girders and assemblies.
6. Lifting Devices and Special Procedures.
a. The erection plans and procedures shall include the details, weight, capacity, and
arrangement of all rigging (beam clamps, lifting lugs, etc.) and all lifting devices (such as
spreader and lifting beams) required for lifting primary members. The submittal shall also
specify details for rigging or lifting devices bolted or welded to permanent members,
including the method and time (shop or field) of attachment and capacity, as well as
methods, time, and responsibility for removal.
b. As necessary, the submittal shall provide special lifting/handling procedures for any
primary member with potential stability or slenderness issues.
DS-23023, Page 4 of 5
7. Bolting Requirements.
The submittal shall indicate the bolting requirements for field splices and cross-frame (or
diaphragm) connections for each stage.
8. Bearing Blocking and Tie-Down Details.
The submittal shall indicate blocking and/or tie-down details for the bridge bearings, and
associated force demands as necessary.
9. Load Restrictions.
Restrictions regarding wind loading, construction dead and live loadings, and any other
applicable loading restrictions shall be included in the submittal, as necessary.
10. Temporary Supports.
a. The submittal shall include the location of any temporary support structures (see Article
23023.03, D, 2) and bracing, as well as details of the temporary support structure itself. If
the temporary support is to be prefabricated (selected from a supplier’s catalogue), the
type and capacity shall be defined in the submittal, as necessary; lateral capacity as well
as vertical capacity requirements shall be considered as appropriate. If the temporary
support is to be constructed by the Contractor on site, a complete design with full details,
including member sizes, connections, and bracing elements shall be provided in the
submittal in accordance with Article 2408.03, L of the Standard Specifications. In either
case, details regarding the upper grillage and temporary bearing assembly (i.e., details of
how the steel girders will bear on the temporary support), including the top of falsework
(bottom of structural steel) elevations, shall also be included in the erection plans and
procedures. In addition, all foundation requirements for temporary support structures
shall be provided in the submittal.
b. The submittal shall indicate the location of hold cranes that are used to provide temporary
support to the steel assembly (see Article 23023.03, D, 2) and the associated crane
loads. The hold crane type, capacity, boom lengths, pick radius, and means of
attachment to the girders shall also be indicated in the submittal.
c. The submittal shall include the location and details for temporary tie-downs that are
required to facilitate the steel erection, as well as the associated tie-down loads. At a
minimum, the details shall include the tie-down, girder attachment devices, and anchoring
devices.
d. The submittal shall clearly indicate when, and under what conditions, any temporary
supports or holding cranes may be released in the erection sequence, and if they may be
left in place while subsequent erection proceeds.
e. The submittal shall clearly indicate appropriate restraint of girders from twisting and/or
layover at supports. Girders should be restrained from twist and/or layover at supports
unless the need for such restraint is demonstrated to be unnecessary by appropriate
analysis in the erection engineering calculations.
11. Jacking Devices.
The submittal shall indicate jacking devices that will be required to complete the steel
erection. Their location, type, size, and capacity shall be indicated, as well as their intended
use, sequence of engagement, load level, jack pressure table, and any other key parameters
of their operation.
23023.04 CONSTRUCTION.
A. The Contractor is completely responsible for protection of the structural integrity of the bridge
superstructure components from fabrication to final approved placement. Any damage sustained by
DS-23023, Page 5 of 5
structural steel, during erection shall be repaired or replaced by the Contractor, to the satisfaction of
the Engineer at no additional cost to the Contracting Authority.
B. Changes in the approved Girder Erection Plan will not be allowed except under one of the following
three conditions:
• Changes in the Girder Erection Plan shall be approved by the Engineer, or
• Changes in the Girder Erection Plan shall be approved by the Erection Engineer, when the
Erection Engineer is present on the construction site to approve the changes. Written
documentation of the changes to the Girder Erection Plan shall be certified by the Erection
Engineer and submitted to the Engineer within 3 calendar days, or
• Changes in the Girder Erection Plan shall be approved and certified by the Erection Engineer in
written form to the Contractor and submitted to the Engineer prior to implementation.
C. Upon completion of construction operations and Engineer approval, all equipment shall be removed,
and all existing ground lines and site conditions modified by the Contractor to facilitate construction
activities shall be restored to undamaged existing condition unless approved otherwise by the
Engineer.
23023.05 METHOD OF MEASUREMENT.
No measurement will be made.
23023.06 BASIS OF PAYMENT.
All costs of furnishing, submitting, and revising the Girder Erection Plan shall be included under contract bid
item Girder Erection Plan.
DS- 23082
(Replaces DS-23062)
DEVELOPMENTAL SPECIFICATIONS
FOR
HIGH PERFORMANCE CONCRETE FOR STRUCTURES
Effective Date
January 21, 2026
THE STANDARD SPECIFICATIONS, SERIES 2023, ARE AMENDED BY THE FOLLOWING
MODIFICATIONS AND ADDITIONS. THESE ARE DEVELOPMENTAL SPECIFICATIONS AND THEY
PREVAIL OVER THOSE PUBLISHED IN THE STANDARD SPECIFICATIONS.
23082.01 DESCRIPTION.
A. Develop and provide high performance concrete (HPC) for bridge substructures and decks when
called for in the contract documents. HPC is defined as a concrete mix providing the following:
• Desired workability.
• Maximum 28 day permeability of 2000 coulombs for the substructure (or greater than 20 K
ohm-cm surface resistivity by Wenner probe) and 1500 coulombs for the deck (or greater
than 30 K ohm-cm surface resistivity by Wenner probe), as a target.
B. Apply Sections 2403, 2412, and Division 41 of the Standard Specifications with the following
modifications.
23082.02 MATERIALS.
Contractor may use other mixes than those described below provided they meet the requirements of this
specification and are approved by the District Materials Engineer.
A. Substructure.
1. Apply the following conditions for substructure HPC mixes:
• Coarse aggregate meeting Class 3i durability.
• Basic water to cementitious material (w/c) ratio in accordance with Materials I.M. 529.
2. HPC mix for substructure may be a HPC-S or CV-HPC-S. Apply the following conditions:
a. Use one of the following cement combinations:
• Type IS, IP or IT.
• Type I, II or IL with a minimum of 30% weight substitution with GGBFS.
b. Fly ash substitution not to exceed 20% by weight of the cement.
c. Maximum total substitution of 50%
d. A high range water reducer may be used with a maximum allowable slump of 8 inches
and target air content of 7.5% ± 2.0%.
B. Deck.
1. Apply the following conditions for deck HPC mixes:
DS-23082, Page 2 of 3
a. Use coarse aggregate meeting Class 3i durability.
b. Basic w/c ratio in accordance with Materials I.M. 529.
2. The HPC mix for the deck may be a HPC-D or a CV-HPC-D. Apply the following conditions:
a. Use one of the following cement combinations:
• Type IS, IP or IT.
• Type I, II or IL with a minimum of 30% weight substitution with GGBFS.
b. Fly ash substitution not to exceed 20% by weight of the cement.
c. Maximum total substitution of 50%.
d. Combined aggregate gradation optimized in Zone II according to Materials I.M. 532.
C. Contractor Designed HPC.
Other mixes meeting the above requirements may be approved by the District Materials
Engineer.
23082.03 CONSTRUCTION.
A. Production Concrete.
1. Notify the Engineer at least 48 hours prior to placement of production concrete. Use only
approved HPC mixes for production concrete. If a mix other than mix described in Article DS-
23082.02, A or B is to be used, ensure it has same materials, proportions, and properties
(including slump, air content, and w/c ratio) as approved by the District Materials Engineer.
2. District Materials Engineer will obtain random verification strength samples on a minimum of
one deck placement. Strength samples will be tested at District Materials Laboratory
according to AASHTO T 22. A set of four cylinders will be cast, cured, and handled according
to Materials I.M. 315. Three cylinders will be tested for strength at 28 days. One cylinder will
be tested for permeability on a random basis by Central Materials Laboratory or Wenner
probe resistivity testing by the District Materials Engineer. Permeability testing will not be
evaluated on footings or drilled shafts.
B. Placing Concrete.
For the deck, placing of concrete floors shall not begin if the theoretical rate of evaporation
exceeds 0.1 pounds per square foot per hour. Monitor theoretical evaporation rate at a maximum
interval of every three hours during placement at a location as near the deck as possible. If the
rate exceeds 0.15 pounds per square foot per hour cease placement at next location acceptable
to Engineer.
C. Curing.
1. Substructure.
a. Leave forms in place for 96 hours of curing.
b. Apply curing protection to exposed surfaces of concrete in accordance with Article
2403.03, E, 4, b. Leave curing protection in place for 96 hours.
2. Deck.
a. Leave forms in place for 168 hours of curing.
b. Apply water to the burlap covering for 168 hours of continuous wet sprinkling system
curing.
c. Do not place curing compound on floor.
d. Use burlap that is prewetted by fully saturating, stockpiling to drain, and covering with
plastic to maintain wetness prior to placement. Place two layers of prewetted burlap on
floor immediately after artificial turf drag or broom finish with a maximum time limit of 10
minutes after final finishing. Apply water to burlap covering for entire curing period by
means of a continuous wet sprinkling system that is effective in keeping burlap wet during
moist curing period.
DS-23082, Page 3 of 3
e. Use evaporation retardant only in situations where equipment and/or labor delays, or
environmental conditions, prevent adequate protection of concrete until prewetted burlap
is in place. Have an evaporation retardant, including Confilm, Conspec Acquafilm,
Evapre, or Sure Film, readily available during placement for application as directed by the
Engineer. Do not work evaporation retardant into concrete surface or use as a finishing
aid.
D. Cold Weather Protection.
1. Furnish results to Engineer in electronic format as required. Apply Article 2403.03, F of the
Standard Specifications.
2. Replace the provisions of Article 2403.03, F, 5, d, of the Standard Specifications with the
following:
a. Substructure.
The duration of required cold weather protection shall be the first 120 hours after placing.
Ensure concrete and its surface temperature are maintained at a temperature of no less
than 50ºF for the first 120 hours after placing. Curing time will not be counted if concrete
temperature falls below 50ºF. Following completion of the cold weather protection period,
regulate the rate of concrete cooling to prevent thermal shock, until the concrete
temperature falls within 35ºF of ambient air temperature.
b. Deck.
The duration of required cold weather protection shall be the first 168 hours after placing.
Ensure concrete and its surface temperature are maintained at a temperature of no less
than 50ºF for the first 168 hours after placing. Curing time will not be counted if the
concrete temperature falls below 50ºF. Following completion of the cold weather
protection period, regulate the rate of concrete cooling to prevent thermal shock, until the
concrete temperature falls within 35ºF of ambient air temperature.
23082.04 METHOD OF MEASUREMENT.
Measurement for High Performance Concrete will be the cubic yards shown in the contract documents.
23082.05 BASIS OF PAYMENT.
A. Payment for High Performance Concrete will be at the contract unit price per cubic yard. Payment
includes cost for testing production concrete.
B. For High Performance Concrete placed within the contract period, additional payment will be
made for heating of concrete mix ingredients, cold weather protection of placed concrete, or both.
Payment for heating of mix ingredients and cold weather protection will be in accordance with
Articles 2403.05, A, 3 and 4, of the Standard Specifications. The duration of cold weather
protection eligible for payment shall be as specified in Article DS-23082.03, D, 2.
- Package Files
- Name
- 20OCT015\Plan\94-2690-631\94-2690-631.pdf
- Bytes
- 31193487
- Name
- 20OCT015\Prop\DS-23023.pdf
- Bytes
- 65946
- Name
- 20OCT015\Prop\DS-23081.pdf
- Bytes
- 215649
- Name
- 20OCT015\Prop\DS-23082.pdf
- Bytes
- 149337
- Name
- 20OCT015\Prop\estprop015.pdf
- Bytes
- 304928
- Package Pages
- 22
- Categorized By
- llm
- Package Scope Docs
- 3
- Package Manifest Only
- No