The Project consists of construction of a new pressure reducing valve (PRV) and flow meter (FM) vault,
with associated piping and appurtenances at the Richland Creek Water Treatment Plant to regulate
pressure in the plant feed piping and provide flow monitoring. The scope will include, but is not limited to,
the following major elements: – Construction of a new underground PRV and FM vault, including a precast concrete vault, access
hatches, and an internal access ladder. – Installation of new finished water piping and sample line within and outside the vault, including all
required fittings, restraints, and connections to existing water mains. – Furnishing and installation of a PRV, FM assembly, isolation and bypass valves, and associated
mechanical appurtenances. – Provision and installation of electrical power, grounding, and instrumentation necessary for flow
and pressure monitoring, including conduits and wiring for integration with the existing control
system.
Project No. 2502595 1 Section 00 11 00
PCWS Richland WTP PRV and FM Vault Advertisement for Bids
PAULDING COUNTY WATER SYSTEM
Paulding County, Georgia
RICHLAND CREEK WTP PRESSURE REDUCING VALVE AND FLOW METER VAULT
Client Project No. 27012-3802
ADVERTISEMENT FOR BIDS
Sealed bids for RICHLAND CREEK WTP PRESSURE REDUCING VALVE AND FLOW METER VAULT
are to be constructed for PAULDING COUNTY BOARD OF COMMISSIONERS dba PAULDING COUNTY
WATER SYSTEM. Bids may be submitted electronically through the Paulding County Bonfire
eProcurement Portal or by sealed envelope to the Paulding County Department of Finance, 240
Constitution Blvd., Dallas, Georgia 30132. Bids will be received at the office of the Paulding County
Department of Finance until 10AM on FRIDAY, NOVEMBER 13, 2026, at which time the bids shall be
publicly opened and read aloud.
A Mandatory Pre-Bid Conference will be held on Monday, October 26th at 1 PM at the Richland Creek
Water Treatment Plant, 11479 Cartersville Hwy, Dallas, GA 30132. Each bidder shall be limited to three
personnel per organization.
The Project consists of construction of a new pressure reducing valve (PRV) and flow meter (FM) vault,
with associated piping and appurtenances at the Richland Creek Water Treatment Plant to regulate
pressure in the plant feed piping and provide flow monitoring. The scope will include, but is not limited to,
the following major elements:
• Construction of a new underground PRV and FM vault, including a precast concrete vault, access
hatches, and an internal access ladder.
• Installation of new finished water piping and sample line within and outside the vault, including all
required fittings, restraints, and connections to existing water mains.
The scope includes construction of a new underground PRV and FM vault, including a precast concrete vault, access hatches, and an internal access ladder; installation of new finished water piping and sample line within and outside the vault, including all required fittings, restraints, and connections to existing water mains; furnishing and installation of a PRV, FM assembly, isolation and bypass valves, and associated mechanical appurtenances; and provision and installation of electrical power, grounding, and instrumentation necessary for flow and pressure monitoring, including conduits and wiring for integration with the existing control system.
We post new plumbing opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-77892-NONST-2027-000000094), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.