Sealed bids will be received by Bartow County, Georgia for the furnishing of all materials, labor, tools, skills, equipment and incidentals necessary for the construction of Cassville White Road widening Ph 2.
For the full description please click on the attached supporting document(s).
00010-1
ADVERTISEMENT FOR BIDDERS
Sealed bids will be received by Bartow County, Georgia, herein referred to as the Owner,
at the Frank Moore Administration and Judicial Building located at 135 West Cherokee
Avenue, Cartersville, Georgia, 30120, in the Commissioner’s Conference Room, until:
Tuesday, November 10, 2026, 3:00 P.M., Local Time
for the furnishing of all materials, labor, tools, skills, equipment and incidentals necessary
for the construction of:
BARTOW COUNTY, GEORGIA
CASSVILLE WHITE ROAD PHASE II WIDENING
WATER AND SANITARY SEWER RELOCATION
BARTOW BID NO. 26-55-05
at which time and place the bids will be publicly opened and read aloud. Bids received
after the designated time will not be considered.
The principal items of construction are the following:
12” DIP Water Main – PC 350 1,500 LF
8” DIP Water Main – PC 350 160 LF
6” DIP Water Main – PC 350 400 LF
3” HDPE Sanitary Sewer Force Main DR 9 450 LF
20” Steel Casing 440 LF
12” Steel Casing 205 LF
Bidders shall inform themselves concerning Georgia Law and comply with same.
Plans, specifications and contract documents are open to public inspection at both the main
office of the Bartow County Water Department located at 50 Nelson Street, Cartersville,
Georgia, 30120, and the Marietta Office of AtkinsRéalis located at 188 Anderson Street,
Suite 125, Marietta, Georgia 30060. One contract will be awarded covering all the work.
Maximum time for substantial completion shall not exceed 100 consecutive calendar days,
and maximum time for final completion shall not exceed 450 consecutive calendar days.
Time for construction contract close-out shall not exceed 480 consecutive calendar days
post NTP. Note time for final construction is to be defined by road construction schedule.
Furnish all materials, labor, tools, equipment and incidentals for construction of water main (12-inch, 8-inch and 6-inch DIP), a 3-inch HDPE sanitary sewer force main, and 20-inch and 12-inch steel casings as part of the Cassville White Road Phase II widening.
We post new plumbing opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-60800-NONST-2027-000000056), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.