Sealed bids for construction of the City of Oxford Water and Electric Meter Replacement will be received until the closing time of November 4, 2026 at 2:00 PM local time. Bids must be submitted by the Bidder electronically through QuestCDN.com. No paper submissions will be accepted. Any bid received after the bid closing time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically provided in the Instructions ...please see supporting documents.
SECTION 00100-1
INVITATION TO BID
City of Oxford C&S Project No: O9800.008
Water and Electric Meter Replacement September 2026
Revision 0
INVITATION TO BID
PART 1. GENERAL
1.1 COMPETITIVE COST SEALED BIDS
Sealed bids for construction of the City of Oxford Water and Electric Meter Replacement
will be received until the closing time of November 4, 2026 at 2:00 PM local time. Bids must
be submitted by the Bidder electronically through QuestCDN.com. No paper submissions will
be accepted. Any bid received after the bid closing time and date will not be considered
by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a
period of sixty (60) days except as specifically provided in the Instructions to Bidders and/or
by State law. Base Cost of all Bids will be posted by the Owner/Engineer to the QuestCDN
website within approximately 30 minutes after the bid closing time.
1.2 SCOPE OF WORK
The Work shall consist of providing all labor, equipment, and materials necessary to remove
and replace approximately 770 3/4", 1", and 2" water meters and AMI transmitters, install
approximately 200 AMI transmitters (MOU's) on existing water meters, install approximately
705 3/4" backflow preventers, replace meter boxes, lids, and curb stops as necessary, remove
and replace approximately 750 electrical meters, and document service line material,
including site restoration, data collection, communication with property owners, and all
appurtenances necessary for a complete installation. Water meters, electric meters, and AMI
transmitters will be provided by the Owner. Time allotted for completion of work is 210
consecutive calendar days.
The work shall be administered as two separate Contracts.
The Work shall consist of providing all labor, equipment, and materials necessary to remove and replace approximately 770 3/4", 1", and 2" water meters and AMI transmitters, install approximately 200 AMI transmitters (MOU's) on existing water meters, install approximately 705 3/4" backflow preventers, replace meter boxes, lids, and curb stops as necessary, remove and replace approximately 750 electrical meters, and document service line material, including site restoration, data collection, communication with property owners, and all appurtenances necessary for a complete installation. Water meters, electric meters, and AMI transmitters will be provided by the Owner. Time allotted for completion of work is 210 consecutive calendar days. The work shall be administered as two separate Contracts. Contract A shall include the work for replacing the water meters, and Contract B shall include the work for replacing the electrical meters.
We post new electrical opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-70760-NONST-2026-000000013), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.