The Fort Valley Utility Commission (FVUC) will accept sealed bids from qualified contractors for labor associated with theconstruction of the electric primary feeder system serving the Blue Bird Expansion Project in Fort Valley, Georgia.The project generally consists of construction and installation of a 7.2 kV phase-to-ground / 12.47 kV phase-to-phase,three-phase underground electric distribution system, including undergroundprimary cable and conduit systems,pad-mounted transformers, PME switchgear, primary metering equipment, terminating cabinets, vaults, pads, grounding,terminations, testing, commissioning, and associated work as described in the Statement of Work and construction drawings.This project shall be bid on a labor-only basis. Fort Valley Utility Commission will furnish the major electrical materialsrequired for construction as identified in the Contract Documents. The Contractor shall furnish all labor, supervision, qualifiedpersonnel, construction equipment, tools, transportation, testing equipment, safety equipment, and other labor-related itemsnecessary to provide a complete installation of FVUC-furnished materials.The project completion date shall be TBD by Parrish Construction and Blue Bird.Bids will be considered only from experiencedand properly licensed contractors regularly engaged in electric utilityconstruction of similar type and magnitude. All work shall comply with the applicable ECG Construction AssemblySpecifications for 12.5/7.2 kV Distribution Systems, FVUC standards and specifications, approved project drawings,manufacturer requirements, NESC, OSHA, Georgia 811, and applicable federal, state, and local requirementsTheStatement of Work and applicable construction drawings are included with or incorporated into the bid package MANDATORY PRE BID NOVEMBER 02 2026 AT 10:00AM 500 AnthoineStreet, FortValley, Georgia 31030. Contact Ray Martin at gmartin@fvutil.com or 478-550-4385.
W W
W W
W
FIREFIREFIREFIREFIRE
FIRE FIRE
FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE
FIREFIREFIRE
FIREFIREFIREFIREFIREFIREFIREFIREFIREFIREFIREFIREFIREFIREFIREFIRE FIRE FIRE
FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE
FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE
W
W
W
FIRE
FIRE
FIRE
W W
FIRE FIRE FIRE
FIRE FIRE FIRE
S
S
S
S
S
S
S
S
S S
S S
S S S
S
S
SS
S
S
S
S
NEW BUILDING
918,390 SF WITH THE
PARCEL# F06F 022
FFE 498.00
ZONE "A"
ZONE "X"
DRAINAGE
DITCH
ZONE "X"
APPROX. LIMITS OF THE
FLOOD HAZARD AREA
ZONE "X"
ZONE "A"
NEW BUILDING
39,474 SF
FFE 497.00
DRAINAGE
DITCH
PARKING LOT
180 CAR PARKING
SPACES
.
R/W R/W R/W
1/2"
RBF
1/2"
OTF
1/2"OTF
CMF
R/W
100' R/W GEORGIA STATE ROUTE 49
BLUE BIRD BOULEVARD
(PB 25, PG 297)
100' R/W U.S.
Construction and installation of a 7.2 kV phase-to-ground / 12.47 kV phase-to-phase three-phase underground electric distribution system, including underground primary cable and conduit systems, pad-mounted transformers, PME switchgear, primary metering equipment, terminating cabinets, vaults, pads, grounding, terminations, testing, commissioning, trenching, excavation, backfill, switching, phasing and voltage verification, restoration and as-built documentation, with major electrical materials furnished by FVUC and all labor, supervision, equipment, tools, transportation and safety provided by the contractor.
We post new electrical opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-33552-NONST-2027-000000021), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.