The anticipated purpose of this RFQ is to solicit proposals from Design/Build Firms to provide professional design/build services for Elevator Cab modernization
ATTACHMENT A: DESIGN BUILDER CHECKLIST AND CERTIFICATION
The undersigned, hereby acknowledges having received Request for Qualification (RFQu) No.27-752-811
Design/Build Services for Elevator Cab Modernization at Cedar Grove HS, Champion Theme MS, Columbia ES,
Druid Hills HS, Dunwoody HS, Lithonia HS, Martin Luther King Jr. HS, Montgomery ES, Rock Chapel ES,
Shadow Rock ES, Snapfinger ES, Southwest DeKalb HS, and Woodward ES (703-36) containing a full set of
documents:
Owner’s Project Specific Information
Appendix A1: Owner’s Narrative and Scope of Work- Cedar Grove High School (2 pages)
Appendix A2: Owner’s Narrative and Scope of Work – Champion Theme Middle School (2 pages)
Appendix A3: Owner’s Narrative and Scope of Work – Columbia Elementary School (2 pages)
Appendix A4: Owner’s Narrative and Scope of Work -Dunwoody High School (2 pages)
Appendix A5: Owner’s Narrative and Scope of Work -Lithonia High School (2 pages)
Appendix A6: Owner’s Narrative and Scope of Work -Martin Luther King Jr. High School (2 pages)
Appendix A7: Owner’s Narrative and Scope of Work - Montgomery.
The Design/Build Firm is responsible for full professional Design and Construction services for the complete design and construction of Elevator Cab Modernization at 13 schools. The scope includes replacement of control systems, door operators, hydraulic power units, and signal fixtures; electrification including traveling cable, Wi-Fi access point in cab, hoist way wiring, and security camera in cab; signalization including car operating panel, hall push button stations, and hall lanterns; power unit (submersible or dry mount); hoistway equipment replacement/installation including ladders, hoist beams, lighting, buffers, sump pump, rails, fire alarm devices, and cab; verification of hoistway condition per code; and demolition of existing elevators. The work also includes pre-construction phase services and construction phase services. The modernized elevator shall comply with DCSD Design Guidelines and all federal, state, and local guidelines.
We post new electrical opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-64410-NONST-2027-000000153), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.