Major Items of Work:
General Mobilization & Bonds Storm Water Pollution Prevention Plan and Implementation Traffic Safety Plan Implementation Revegetation of Disturbed Areas
Drainage Improvements:
6” PVC SDR-35 French Drain 6” PVC SDR-35 Drain Line 6” Sloped End Treatment Curb and Gutter Replacement Pavement Repair Fence Repair, Irrigation System Repair, Revegetation, Tree Protection, Etc.
Pre-bid meeting: November 3, 2026 at 2:00 PM (Chicago) — City Council Chambers, Harker Heights City Hall, 305 Miller's Crossing, Harker Heights, TX
Bid opening: November 17, 2026 at 10:00 AM (Chicago) — City Council Chambers, Harker Heights City Hall, 305 Miller's Crossing, Harker Heights, TX
Questions due: November 9, 2026 at 12:00 PM (Chicago)
Questions asked: 3
Bid documents (download requires a free CivCast account):
Major items of work include General Mobilization & Bonds, Storm Water Pollution Prevention Plan and Implementation, Traffic Safety Plan Implementation, and Revegetation of Disturbed Areas. Drainage improvements consist of 6” PVC SDR-35 French Drain, 6” PVC SDR-35 Drain Line, 6” Sloped End Treatment, Curb and Gutter Replacement, Pavement Repair, Fence Repair, Irrigation System Repair, Revegetation, Tree Protection, etc.
We post new asphalt opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>Yes. This item will be bid per Linear Foot (LF). A revised Bid Schedule will be included with Addendum No. 1 which will be distributed after questions cut off on November 9th.</p>""166787c4-c762-4355-86ce-e492c7228b8a""2026-11-02T14:09:06.406Z"false"<p>Pavement repair will be 6' width as called for in the Bid Schedule. Additionally, Note 2 on Sheet P-01 is being updated to reflect that the base thickness to be replaced is 10" per Bid Item 11 in the Bid Schedule. A revised copy of Sheet P-01 will be included with Addendum No. 1.</p>""74c16eea-886b-4295-9f50-8bbcb24494e1""2026-11-02T14:19:40.238Z"false"<p>The intent is to avoid all driveways so as to not have to repair them. At both locations identified in the question, the drain line shall be routed to avoid the driveways. If it requires a slight field adjustment, Contractor shall notify the Engineer prior to beginning work.</p>""aab7f766-fb47-4e57-a90c-b41bfffae546""2026-11-02T14:39:38.65Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6ae11594c96899422dfa55e3), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.