Project includes additional parking spaces, Pickleball and Basketball Courts, court and pedestrian lighting, artificial turf, sidewalks, landscape and irrigation, etc. Plans and specifications enclosed herein.
Type of work: Add three lighted Pickleball and one lighted Basketball court at the Parks at Texas Star Ballfield Complex at 1501 S. Pipeline Road, Euless, Texas 76040.
Pre-bid meeting: October 6, 2026 at 2:00 PM (Chicago) — City of Euless, City Hall, 201 N. Ector Drive, 76039. Pre-Council Chambers. — Site meeting immediately following the Pre-Bid meeting.
Bid opening: October 21, 2026 at 2:00 PM (Chicago) — City of Euless, City Hall, 201 N. Ector Drive, 76039. Office of Purchasing Agent.
Questions due: October 9, 2026 at 5:00 PM (Chicago)
Questions asked: 42
Bid documents (download requires a free CivCast account):
Project includes additional parking spaces, Pickleball and Basketball Courts, court and pedestrian lighting, artificial turf, sidewalks, landscape and irrigation, etc. Plans and specifications are enclosed.
We post new concrete opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>$1.4 million.</p>""660adf34-38c3-4394-b543-ee7124edf7ed""2026-09-21T16:38:40.775Z"false"<p>The City of Euless will pay for required material testing as needed.</p>""a722e092-4da8-4322-9c37-9a6ac1290347""2026-09-21T16:39:10.893Z"false"<p>Contractor covers the cost of the construction water usage.</p>""a2fca7c9-9aa6-409e-b27a-5f5cfe343317""2026-09-21T16:46:19.852Z"false"<p><span style=\"color: black;\">The entirety of the set is Issued for Bid. Titleblocks will be corrected with an addendum going forward. Please let us know which details in particular and we can see about issuing revisions.</span></p>""6234e93a-ef18-4332-80e5-64a0518d3977""2026-09-23T14:49:43.996Z"false"<p>No, the Pre-Bid and Site visit are not mandatory.</p>""d44bfb3a-a2c5-47b5-b775-1d2938cf160c""2026-09-21T16:51:03.614Z"false"<p>No bid bond is required for this project.</p>""0b061139-aa6a-4cd8-bdb6-16ed4ea9f6a9""2026-09-22T15:08:44.756Z"false"<p>Please bid the products as specified and shown on plans. City and Consultant will review possible "or equal" materials or processes with successful bidder during construction.</p>""238023f0-0ef3-4592-8f15-16a839a74240""2026-09-23T14:47:55.469Z"false"<p>Please bid the products as specified and shown on plans. City and Consultant will review possible "or equal" materials or processes with successful bidder during construction.</p>""8c919ec2-7498-407f-9331-cb5ac2b99d41""2026-09-23T14:48:25.769Z"false"<p>Drain marks don't match. The L201 schedule calls D01 atrium and D02 square. The L231 details and the pricing form have them the other way around. <span style=\"color: rgb(200, 38, 19);\">Schedule and Details are correct. The wrong image for NDS #78 atrium grate was used. The Bid form should show Atrium as D01 and Area drain as D02</span></p><p>• Irrigation controller: the pricing form says Rain Bird ESP-LXIVM two-wire with IQ4. The L411 legend shows a Hunter A2C-1200-M. <span style=\"color: rgb(200, 38, 19);\">Controller to match Hunter as noted in notes and plan.</span></p><p>• Court surfacing: the drawings call for NovaPlay, but spec 321823 names SportMaster. <span style=\"color: rgb(200, 38, 19);\">Please bid certified NovaPlay installer per plan. General requirements in specifications still apply. TBG will work with selected contractor for an approved equal as needed during submittals.</span></p><p>• Chain link fence spec (323113) is in the table of contents but missing from the project manual. <span style=\"color: rgb(200, 38, 19);\">Full chain-link spec is included, title for chain-link is missing on the first page. Chain-link spec starts on page 285.</span></p>""ff1e5c9f-5d4e-4d22-b1e8-2d62b9432a59""2026-09-24T16:55:26.682Z"false"<p>A Excel version of the bid form will be uploaded on October 10th after all questions have been answered and the bid form updated with any new descriptions, quantities, etc.</p>""bdc3b3c1-57e9-44e6-8c68-e2d0f49e3342""2026-09-24T16:55:29.795Z"false"<p>Please refer to the structural drawings (<span style=\"color: black;\">detail 2/S100) for correct detail. </span></p>""1597b481-ed2d-4f48-be55-dd696730f9a7""2026-09-28T20:17:01.712Z"false"<p>Link to the Geotechnical Report:</p><p><a href=\"https://acrobat.adobe.com/id/urn:aaid:sc:US:6f694109-de65-49ce-893b-1f5856025f8b \" rel=\"noopener noreferrer\" target=\"_blank\">https://acrobat.adobe.com/id/urn:aaid:sc:US:6f694109-de65-49ce-893b-1f5856025f8b </a></p>""b27fb478-29d0-400a-818e-b9a2887f47a1""2026-09-28T20:33:26.775Z"false"<p>Can you confirm that the scale in question is on the civil sheets? </p>""d6ef38dc-cf15-4a44-9f04-ec4d5b390fd3""2026-10-01T20:52:43.638Z"false"<p>See addendum 1&2 for new plan sets with correct scale.</p>""acc65304-d7c6-4bcb-bdc4-6871148b797f""2026-10-06T21:53:28.258Z"false"<p>Existing grades have been provided on grading plans.</p>""a7c429e7-84c2-42e0-9509-b25241404def""2026-10-08T15:53:43.157Z"false"<p><span style=\"color: rgb(200, 38, 19);\">The overage in Cut/Fill will need to be hauled off-site.</span></p>""2a85f502-a535-4f18-9d2a-d7e5a6fc7d6e""2026-10-08T15:54:51.214Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">See addendum 1&2 for new plan sets with correct scale.</span></p>""6f8c132d-4746-44b4-9e75-9ff0295a88c8""2026-10-08T15:55:27.688Z"false"<p>Notes should state 'refer to notes 1 & 5 on site plan' Refer to E201</p>""15c5e655-beb7-40f3-8d3c-4d02f957a0d3""2026-10-08T15:56:01.415Z"false"<p>Transformer is existing and is located in the circular lawn where batting cages used to be. A utility pedestal may need to be provided depending on number of conductors landing on the existing transformer if not currently installed.</p>""061c7b2c-10a2-4131-ab83-64746ab452f7""2026-10-08T15:56:34.115Z"false"<p>Post sleeves will be installed as required by the manufacturer as noted on L601.</p>""c1e87beb-6bcd-40b8-8d3e-9eb0575610be""2026-10-08T15:57:45.413Z"false"<p>Please bid certified NovaPlay installer per plan. General requirements in specifications still apply. TBG will work with selected contractor for an approved equal as needed during submittals.</p>""3f885b77-f56e-487a-a1f5-b42cc5d236e8""2026-10-08T15:58:35.776Z"false"<p>The irrigation plans and details govern, Bidders shall base their bids on the equipment detailed on sheet L411.</p>""adcb076b-29e6-4b6a-843d-39262c4fe0e0""2026-10-08T15:59:49.195Z"false"<p>Pickleball gates will be designed as shown in detail 1/L342. Typical for all court gates.</p>""4c0186a4-1f54-4c5d-b3f9-b233c60f83b1""2026-10-08T16:00:25.073Z"false"<p>The irrigation plans and details govern, Bidders shall base their bids on the equipment detailed on sheet L411.</p>""0ea95de1-02bb-4e0f-880e-f0f1ddd2e647""2026-10-08T15:59:38.336Z"false"<p>The irrigation plans and details govern, Bidders shall base their bids on the equipment detailed on sheet L411.</p>""d2e1ebe7-9dfc-4987-866b-75a13acaffa5""2026-10-08T15:59:27.255Z"false"<p>This quantity has been verified by the Civil Engineer for the project.</p>""ba8bd3aa-c41c-47b4-89fb-0dc209f42e6f""2026-10-08T15:46:27.155Z"false"<p><span style=\"color: black;\">The pickleball chain link height is shown correctly in the landscape detail at 10'. Fencing should conform to the requirements in section 323113 and recommendation in CLFMI WLG 2445 - chain link fence wind load guilde for the selection of line pose and line pose spacing. Use a floor flange mount for all posts as shown in the structural detail, carefully marking tendon locations to verify minimum clearance prior to drilling and setting flanges.</span></p>""89b4f2fa-ab97-4948-9725-e431575cb450""2026-10-08T21:42:10.503Z"false"<p><span style=\"color: black;\">Mounting and anchoring is shown correctly in the structural detail. Height and design for the fence will remain as shown in the landscape detail.</span></p><p></p>""8e5a6845-2a70-4dd2-aea6-1dc9a345e765""2026-10-08T22:00:07.523Z"false"<p>Yes structural drawings will be stamped by an engineer.</p><p></p>""ce3cea5b-c4ec-4de8-b1db-7498204d35b6""2026-10-08T16:13:26.688Z"false"<p>Erosion Control has been added to the bid form. See Addendum #3 for an Excel Version of the Bid Form.</p><p></p>""732da908-40f7-46ad-8fd3-9f75b596b3f1""2026-10-08T16:16:08.645Z"false"<p>The quantity of 22,754 SF includes the proposed concrete pavement, proposed concrete sidewalk, and proposed concrete curb. These quantities are based directly on the areas shown on the C03.1 Paving Plan. Please see the attached bid form calculation sheet for additional detail.</p><p></p>""9e42bbf8-a7a5-4f63-9027-7057a56fef80""2026-10-08T16:18:51.241Z"false"<p>There are no proposed storm drainage items on civil sheets. Any proposed items are included on landscape sheets. </p><p></p>""c071679e-f949-484f-92fe-6bec39101d5d""2026-10-08T16:18:31.473Z"false"<p>Basketball hoop specs are clarified in the furnishing schedule on sheet 601</p><p></p>""a4a20b4d-4b77-45bb-a4db-6768f23c7e40""2026-10-08T16:18:06.854Z"false"<p><strong style=\"background-color: rgb(248, 249, 250);\">Bid form will be updated to place bid as lumpsum for piping for both D04 and D05. Schedule updated to note to refer to plans for layout and sizing. Final Bid Form will be uploaded on Monday, October 12, 2026.</strong></p>""368cc011-b4a7-48b6-85a8-aa4803452f10""2026-10-09T19:59:54.786Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">The irrigation plans and details govern, Bidders shall base their bids on the equipment detailed on sheet L411.</span></p>""589125a6-f7da-4ef5-81a3-634de00a4dc4""2026-10-08T22:01:42.465Z"false"<p><strong style=\"background-color: rgb(248, 249, 250);\">The subgrade preparation is in section 5.1 of the geotechnical report. The moisture conditioned soil below the proposed structures should be compacted at 95% of MDD and +2% of OMC.</strong></p>""39aca922-83c8-44fe-bca0-4dcc93a18721""2026-10-09T19:56:28.875Z"false"<p>Please see attached Addendum #4 for a Bid Due Date Extension.</p><p></p><p>A final Excel version of the Bid Form will be uploaded on Monday, October 12th after all questions have been answered.</p>""f66e634d-8925-4e74-885e-ea3538bf690c""2026-10-09T19:35:57.068Z"false"<p><strong style=\"background-color: rgb(248, 249, 250);\">3 qty. Medium boulders per plan.</strong></p>""209f8839-7d06-41db-8e48-790f68361e58""2026-10-09T19:57:08.005Z"true"<p><strong style=\"background-color: rgb(248, 249, 250);\">Bid form cells will be updated and corrected. </strong><strong style=\"background-color: rgb(248, 249, 250); color: rgb(60, 64, 67);\">Final Bid Form will be uploaded on Monday, October 12, 2026.</strong></p>""294f8069-5642-4d4c-acd8-8a6ff5d84ba1""2026-10-09T20:01:17.604Z"false"<p><strong style=\"background-color: rgb(248, 249, 250);\">3 qty. Medium boulders per plan.</strong></p>""200ff60f-74a9-4337-b8a0-5f3ec4b5a4c6""2026-10-09T19:57:43.57Z"false"<p><strong style=\"background-color: rgb(248, 249, 250);\">Please bid as a standard 2" diamond mesh.</strong></p>""4d02babb-c07d-431f-8f28-250b26266cf6""2026-10-09T19:58:08.675Z"false"<p>CivCast Bid Notice has been updated to reflect the new bid date.</p>""375207fa-a4ec-437e-af0d-d906e53471e4""2026-10-09T20:25:23.241Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6aad81fd550b822979bbb4c5), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.