The project includes rehabilitation and capacity improvements to the Jim Walters and Port O’ Call South Lift Stations to provide duplex pumping capability and improve reliability. Work generally includes wet well cleaning, concrete repairs and coatings, installation of a second submersible pump with guide rails, replacement of discharge piping, and new check and isolation valves at both stations. Site improvements include access road repairs, fencing, and lift station identification signage. Electrical work includes new duplex pump control panels and local audible and visual alarms associated with the added pumps. Both lift stations include a manual transfer switch and portable generator quick-connection facility. Electrical work also includes new duplex control equipment, local audible/visual alarm, utility service modifications, site lighting, and reconnection of existing radio/telemetry interfaces as shown.
.
.
.
Microsoft Teams meeting
Join: https://teams.microsoft.com/meet/28501420097437?p=Lx7tJp52pSRAGT3RzK
Meeting ID: 285 014 200 974 37
Passcode: va6mg7m3 .
Dial in by phone +1 469-206-8447,,534576868# United States, Dallas (866) 606-1179,,534576868# United States (Toll-free)
Type of work: Lift Station Rehabilitation
Pre-bid meeting: October 20, 2026 at 1:00 PM (Chicago) — Norma Coble Civic Center 51 Runaway Bay Dr Runaway Bay, TX 76426 — Site visit will follow Pre-bid meeting
Bid opening: November 3, 2026 at 11:00 AM (Chicago) — Online/Electronic Bidding via CIVCAST — MS Teams bid opening teleconference/call-in information is provided in the CIVCAST Scope section.
Questions due: October 22, 2026 at 12:00 PM (Chicago)
Questions asked: 16
Bid documents (download requires a free CivCast account):
Work generally includes wet well cleaning, concrete repairs and coatings, installation of a second submersible pump with guide rails, replacement of discharge piping, and new check and isolation valves at both stations. Site improvements include access road repairs, fencing, and lift station identification signage. Electrical work includes new duplex pump control panels and local audible and visual alarms associated with the added pumps. Both lift stations include a manual transfer switch and portable generator quick-connection facility. Electrical work also includes new duplex control equipment, local audible/visual alarm, utility service modifications, site lighting, and reconnection of existing radio/telemetry interfaces as shown.
"<p>The correct bid due date is November 3, 2026 at 11:00 AM. CIVCAST has been updated to reflect the correct bid due date.</p>""e798fa1c-e093-45e7-bf7d-20f0bc62d32b""2026-09-17T17:19:15.369Z"false"<p>Build America, Buy America Act (BABA) EPA requirements are provided in the project specifications under CDS Supplemental General Conditions.</p>""e0950388-145f-4be4-b243-1ad36650bb6c""2026-09-17T18:40:04.904Z"false"<p>Yes, submersible pumps for this project are subject to <span style=\"background-color: rgb(248, 249, 250); color: rgb(60, 64, 67);\">Build America, Buy America (BABA) requirements.</span></p>""c4faf4dc-ce45-4458-91da-0e75e041a21a""2026-09-22T15:13:35.855Z"false"<p>No. The Owner will not accept alternate pump manufacturers. Pumps shall be provided as specified in the Contract Documents.</p>""2c275794-b407-4f5e-a0aa-48f8739b661a""2026-09-28T13:56:57.344Z"false"<p>Correction to Response No. 4: The Owner will consider proposed equal products that comply with the substitution procedures and requirements of the Contract Documents. Refer to Section 00 21 13 in Addendum No. 1 for substitution requirements</p>""6c5faf81-9d7a-4179-80bc-7c9158685e06""2026-10-14T19:57:06.474Z"false"<p>The lift stations do not have a physical address. However, approximate GPS coordinate are provided below:</p><p></p><p>Jim Walters: 33.1779119, -97.8949867</p><p>Port O'Call South: 33.1653812, -97.8730120</p>""1f66ae4a-2e3f-4117-8d39-c68350c3b21c""2026-10-02T22:10:06.89Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">No. The Owner will not accept alternate pump manufacturers. Pumps shall be provided as specified in the Contract Documents.</span></p>""68621f98-c93b-4a97-a2b5-fdc1ef851d2d""2026-10-01T17:13:51.1Z"false"<p>Correction to Response No. 6<strong>:</strong> The Owner will consider proposed equal products that comply with the substitution procedures and requirements of the Contract Documents. Refer to Section 00 21 13 in Addendum No. 1 for substitution requirements.</p>""2ec6dbe7-7ac3-4820-8ddd-bcaa1a672ad1""2026-10-14T19:56:28.132Z"false"<p>Please specify or clarify what additional information is needed.</p>""8b0cbc98-ea53-4d21-8397-134b8c337af3""2026-10-06T18:35:29.361Z"false"<p>Disadvantaged Business Enterprise (DBE) instructions and requirements are outlined in Section 00 21 13, Instructions to Offerors, Paragraphs 11.07, 23.01, and 24.02. All required DBE forms must be submitted with the bid package.</p>""82733955-2373-4d04-ae14-dcbd868e6beb""2026-10-14T19:39:36.456Z"false"<p>The pre-bid meeting and site visit date and time was verified on CIVCAST. The meeting time is 1pm CST.</p>""4cd1610a-663b-4f3f-b819-9b4676bbfb0e""2026-10-19T18:06:22.988Z"false"<p>The pre-bid meeting and site visit was verified on CIVCAST. The meeting time is 1pm CST.</p>""9902f864-f1e3-41a2-9733-adbec0787b30""2026-10-19T18:06:31.243Z"false"<p>The bid delivery will be electronic only via CIVCAST.</p>""d63cda96-d0e5-4a93-864c-150621606223""2026-10-21T13:56:02.131Z"false"<p> Yes, an item will be added to the bid form in upcoming Addendum 2 for the Port O'Call South discharge piping.</p>""14df78d5-eacb-4c00-ab9c-362b058eba8b""2026-10-22T20:34:33.41Z"false"<p>Quantities will be revised in upcoming Addendum 2.</p>""d6f4c10e-a59d-44ea-bfa6-9d4794481e29""2026-10-22T20:34:46.459Z"false"<p>Refer to the Contract Drawings for the required manhole diameters. Exact manhole depths at the proposed locations are not known. It was assumed each bypass manhole will extend to the approximate elevation of the corresponding sanitary sewer inlet shown entering the adjacent lift station wet well. The Contractor shall field verify existing elevations and conditions prior to construction and provide the manhole depth necessary to accommodate the proposed connections.</p>""ed66be8f-ee9a-4eac-9428-ec614c2391b2""2026-10-26T18:00:05.38Z"false"<p>Items 25 and 26 to be removed via upcoming Addendum 2. Existing pump shall be removed, and two new pumps shall be installed.</p>""c2e67ea4-0a0d-4998-9756-2b5dcd1cdaa2""2026-10-22T20:34:59.647Z"false"<p>Available flow information is limited to the information provided in Section 02 96 00 and the Contract Documents. Flow monitoring was not performed as part of the Project and measured average dry-weather and peak wet-weather flows are not available. The flow ranges presented in Section 02 96 00 are based on the available system information and calculated full-pipe flow, as noted therein. The Contractor shall account for the available information in preparation of its bid and shall verify operating conditions and flows prior to development and submittal of the final bypass pumping plan. Bypass pumping equipment shall be sized in accordance with Section 02 96 00 based on the verified conditions.</p><p></p><p>No prescribed bypass duration is established for either lift station. Bypass duration will depend upon the Contractor's proposed sequencing, means and methods, selected coating system, manufacturer-required curing periods, and required inspections/testing. Bypass pumping was not intended to be required for installation of the proposed doghouse-style bypass manholes. The Contractor shall be responsible for determining the means, methods, and sequencing of construction necessary to perform this work. </p><p></p><p>The 28-day curing requirement in Section 09 96 01 applies to attaining the required compressive strength of the concrete prior to the coating application. Final coating cure time prior to return to service shall be based on the Contractor's selected coating material and the respective coating manufacturer's requirements.</p>""c92ca16e-b21c-43c7-8c51-776cdd1a7092""2026-10-26T18:00:35.535Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.