The project generally consists of the furnishing of all labor, materials, equipment, appurtenances, and incidentals as required to properly fabricate, construct, inspect and test the construction items required for the installation of a new 5.0 MG ground storage tank, new piping, valves, fittings and appurtenances to serve the new ground storage tank, and the repair of the existing 5.0 MG ground storage tank at the Old McGregor Pump Station.
Pre-bid meeting: August 27, 2026 at 10:00 AM (Chicago) — Two Pre-Bid Meetings: #1 - Via Zoom, Thursday, August 27, 2026, 10:00 A.M. (Mandatory. Subs welcome but not required.) #2 - Site Visit: Friday, August 28, 2026, 10:00 A.M. 9120 Old McGregor Rd., Woodway, TX 76712 (Mandatory for contractors who did not attend the previous site visit held October 15, 2025. Optional for those that have. Subs welcome but not required.)
Bid opening: October 29, 2026 at 2:00 PM (Chicago)
Questions due: October 14, 2026 at 5:00 PM (Chicago)
Questions asked: 11
Bid documents (download requires a free CivCast account):
The project generally consists of the furnishing of all labor, materials, equipment, appurtenances, and incidentals as required to properly fabricate, construct, inspect and test the construction items required for the installation of a new 5.0 MG ground storage tank, new piping, valves, fittings and appurtenances to serve the new ground storage tank, and the repair of the existing 5.0 MG ground storage tank at the Old McGregor Pump Station.
We post new metalwork opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>The zoom links can be found on page 3 of the bid package.</p><p>Thank you</p>""498191fe-a321-44ed-a29f-ff866230da74""2026-08-11T15:13:53.167Z"false"<p>Your question will be submitted to the project manager and will be answered via an addendum.</p><p>Thank you</p>""9347934a-2dcc-4511-8c12-9784db6c24b2""2026-08-11T15:15:10.016Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">Your question will be submitted to the project manager and be answered via an addendum.</span></p><p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">Thank you</span></p><p></p>""8581a947-a86d-45dd-9c4c-7b70c9d4dda8""2026-08-11T17:23:28.471Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">Your question will be submitted to the project manager and be answered via an addendum.</span></p><p></p>""4c422c95-51e7-4d29-ab3b-07d2ddb57134""2026-08-13T15:25:11.151Z"false"<p>The plans can be located in the bid package, Appendix I.</p><p><a href=\"https://waco-texas.bonfirehub.com/portal/?tab=openOpportunities\" rel=\"noopener noreferrer\" target=\"_blank\">https://waco-texas.bonfirehub.com/portal/?tab=openOpportunities</a> </p>""08891a05-01ec-41f4-b69b-86c30596ccd3""2026-08-13T15:31:44.52Z"false"<p>Prequalified contractors will submit the Summary Bid Form, Bid and Acknowledgement of Addenda Form and a copy of the Bid Bond. Please see the “requested information” section of this project in the Euna Procurement Portal (Bonfire).</p><p><a href=\"https://waco-texas.bonfirehub.com/portal/?tab=openOpportunities\" rel=\"noopener noreferrer\" target=\"_blank\">https://waco-texas.bonfirehub.com/portal/?tab=openOpportunities</a> </p>""2607c9b6-485e-4847-aaa8-8a9a63a3adfc""2026-08-14T12:17:36.443Z"false"<p>Your question has been submitted to the project manager.</p><p>Thank you</p>""94d11586-efa1-4464-92c5-d181744f3120""2026-08-14T12:25:29.01Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">Your question has been submitted to the project manager.</span></p><p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">Thank you</span></p><p></p>""a57782f0-1679-4b67-8d13-86e4e48d82da""2026-08-14T12:26:11.704Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">Your question has been submitted to the project manager.</span></p><p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">Thank you</span></p><p></p>""98bc19d3-85b4-4e96-8604-b6b6dd6ea2a1""2026-08-14T12:29:33.702Z"false"<p>Your question has been submitted to the project manager.</p><p>Thank you.</p>""ff071d20-3484-44b5-978a-4c3d7e71cb6f""2026-09-02T17:41:49.03Z"false"<p>Your question has been submitted to the project manager.</p><p>Thank you</p>""8ec809aa-a281-448e-9d95-d86a3c5abaf0""2026-09-16T13:23:59.403Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6a7a15c0b87d325d05c9fd35), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.