Contractor shall provide annual inspection, testing, certification, and a preventative maintenance (PM) program for the medical piped gas and vacuum systems to include correction of deficiences and for out-of-cycle (unscheduled) inspection and testing.
The contractor shall perform a complete NFPA 99 inspection, testing, and certification of the medical gas and vacuum systems once per contract year, covering master alarm panels (117), area alarm panels (157), zone valves (514), patient terminals/outlets/inlets (4,279), manufactured assemblies/DISS disconnects (4,279), source supply equipment, bulk oxygen and manifold systems, and medical air/instrument air quality certification. The contractor must also perform preventive maintenance on source and distribution equipment in conjunction with the annual service, correct deficiencies identified during inspections or as requested, and perform out-of-cycle (unscheduled) inspection and testing as needed. An initial baseline certification must be completed within 30 calendar days of award. The contractor shall provide all labor, ASSE-certified personnel, calibrated test equipment, tools, materials, consumables, transportation, and reporting.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""78240""San Antonio""TX""USA""5441 Babcock Road""Suite 302""S02 36C25726Q0888 0002.pdf"178555"file"".pdf""1""2026-09-24T13:51:54.647+00:00""171a546806f04620acf459bbdb312c46""public""0""public""df90edf7215548388468fe15fdc7b126""0"4"0""Maintenance Inspection Report.pdf"4137927"file"".pdf""1""2026-09-24T12:06:46.079+00:00""0e15cefb77764d70bfb6e06ae62c4c15""public""0""public""8ec84e16130b40d1a3adf93e8d6ef8ee""0"3"0""S02 36C25726Q0888 0001.pdf"333274"file"".pdf""1""2026-09-24T12:06:46.079+00:00""471d9be3d4e64132a4f14ff34cc7bbd0""public""0""public""030ff713589a431e828ee7f998bc8a53""0"2"0""S02 36C25726Q0888.pdf"551040"file"".pdf""1""2026-09-11T14:43:01.412+00:00""c7efc846c65142ccb003ee878c26b723""public""0""public""07f86389d0b2416f925a1219308fbe40""0"1"0"Most Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 79aca0edf1e74351ad2727cbe3031ad0), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.