Scope of Work of the Contract Documents includes the following: providing the necessary labor, materials, equipment, supervision, and incidentals for construction of approximately 7,000 linear feet of 20-inch (20"), 16-inch (16"), and 12-inch (12") diameter water transmission and distribution pipelines and all associated valves and appurtenances; flow control and meter stations and associated modifications at Water Plant Nos. 4 (Stafford Run) and 6 (Scanlin); and all else as shown on the construction drawings and specified in the Contract Documents for a complete and fully functioning system.
Engineer's estimate: $5,000,000
Pre-bid meeting: September 21, 2026 at 2:00 PM (Chicago) — 2331 South Main, Stafford, TX 77477
Bid opening: October 7, 2026 at 10:00 AM (Chicago) — 2331 South Main, Stafford, TX 77477
Questions due: October 4, 2026 at 10:00 AM (Chicago)
Questions asked: 13
We have scheduled a window for prospective contractors, subcontractors, and suppliers to visit the water plant sites on Wednesday, September 30, 2026. Water Plant No. 6 (Scanlin) will be open from 9:00am to 10:30am and Water Plant No. 4 (Stafford Run) will be open from 10:30am to Noon.
Bid documents (download requires a free CivCast account):
The scope of work includes providing labor, materials, equipment, supervision, and incidentals for construction of approximately 7,000 linear feet of 20-inch, 16-inch, and 12-inch diameter water transmission and distribution pipelines and all associated valves and appurtenances; flow control and meter stations and associated modifications at Water Plant Nos. 4 (Stafford Run) and 6 (Scanlin); and all else as shown on the construction drawings and specified in the Contract Documents for a complete and fully functioning system.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>Estimate has been added.</p>""c21b211a-acb2-4c16-8840-f20212bc8e36""2026-09-10T19:04:31.828Z"false"<p>A contractor's statement of qualifications form will be provided via addendum.</p>""899120a9-6eae-48ee-bc8d-f356af7cf1e0""2026-09-16T21:49:18.565Z"false"<p>We will not evaluate approved equals prior to the bid opening.</p>""a8874b03-9ed2-4a8f-aa21-d91924e0ef3a""2026-09-22T13:54:42.019Z"false"<p>Contractor shall restore disturbed areas to pre-construction grades after installation of the water line. Any excess spoils will need to be hauled off site.</p>""bb8084bc-29e6-4cc9-8f80-849c45946ee8""2026-09-22T13:43:23.529Z"false"<p>No, Bermad will not be an approved equal for the flow control valve. We will provide a scope of supply for the Cla-Val flow control valve in Addendum No. 1.</p>""56578c36-aefa-4bf0-8185-6cdab74c9913""2026-09-22T13:46:28.753Z"false"<p>The bid date will be extended 1 week. This will be included in Addendum No. 1.</p>""4a0477e0-cd11-4e9f-b1fa-a862951bb0b9""2026-09-22T18:58:54.953Z"false"<p>Stainless steel TS&Vs can be used for the flush valves and combination air valves on the existing water lines. The specifications will be updated in Addendum No. 1.</p>""568f1436-fd7b-4426-b2e8-46252472adde""2026-09-22T19:00:18.531Z"false"<p>Addendum No. 1 will include a revised sheet to split this trenchless section into two smaller sections so methods other than HDD can be used. As discussed in the pre-bid meeting, there are concerns with frac-out if HDD is used here due to the depth of cover.</p>""3dabc6f3-06d9-4972-8adf-76551423b780""2026-09-22T18:10:32.832Z"false"<p>Yes, the contractor may opt to install more of the water line via trenchless than is shown on the drawings provided this is done at the contractor's expense. Pipe installed via trenchless methods must have restrained joints.</p>""7c16a51a-dc19-467d-b7cd-6c9f6a2a6d02""2026-09-22T18:11:52.794Z"false"<p>The bid date will be extended 1 week. This will be included in Addendum No. 1.</p>""26a62566-a6d5-48d7-a1c3-48237543d4c2""2026-09-22T19:00:28.609Z"false"<p>We have scheduled a window for prospective contractors, subcontractors, and suppliers to visit the water plant sites on Wednesday, September 30, 2026. Water Plant No. 6 (Scanlin) will be open from 9:00am to 10:30am and Water Plant No. 4 (Stafford Run) will be open from 10:30am to Noon.</p>""52ae3053-51ad-47fc-ad43-1c6ec31052bd""2026-09-23T14:43:54.235Z"false"<p>We anticipate issuing NTP in November or December.</p>""f053b7a3-f401-4897-8103-6daac2d36c34""2026-09-23T12:42:10.745Z"false"<p>This work is included in Bid Items 16 and 23.</p>""38dc021c-9176-4806-8869-0b5b3b562463""2026-09-24T19:01:53.021Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6aa04da9291a955dbfdb4885), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.