The Work consists of wastewater pipeline improvements including installation of approximately 11,320 LF of 6- and 8-inch diameter PVC pipe for wastewater main and services and approximately 181 LF of 6- and 12- inch ductile iron waterline and the rehabilitation of approximately 236 LF of existing 8-inch diameter wastewater pipe using Cured-In-Place-Pipe lining method. Incidental work includes erosion and sedimentation control, pavement repair,
stormwater pollution prevention plan (SWPPP), and traffic control during construction.
Estimated Amount: $8,784,270.00
Special Notes: Rolling Owner Control Insurance Program. (ROCIP) Compliance Plan Required.
The work consists of installation of approximately 11,320 linear feet of 6- and 8-inch diameter PVC pipe for wastewater main and services; installation of approximately 181 linear feet of 6- and 12-inch ductile iron waterline; and rehabilitation of approximately 236 linear feet of existing 8-inch diameter wastewater pipe using Cured-In-Place-Pipe lining method. Incidental work includes erosion and sedimentation control, pavement repair including hot mix asphaltic concrete and flexible base, stormwater pollution prevention plan (SWPPP) implementation, and traffic control during construction. The project is located in the Lower Fort Branch Wastewater Basin with general area bounded by Oak Cliff Drive to the north, Springdale Road to the west, Webberville Road to the south, and Rhodes Road to the east.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: City of Austin (solicitation 142136), retrieved via Austin Finance Online (AFO). View the official posting, and always confirm requirements and deadlines with the issuing agency.