11/19/2026, Amendment 0001: The purpose of this amendment is to advise all offerors of the following changes to the solicitation regarding date extensions:
Site Visit date: 12/08/2026.
RFIs due date: 12/18/2026.
Proposal due date: extended to 01/15/2027.
See attached PDF, 36C25626R0084 0001. No other changes were made via this amendment.
This procurement will be issued as a 100% Set-Aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) through RFP procedures under FAR 15. The Central Arkansas Veterans Healthcare System (CAVHS) has a requirement Upgrade/Replace Site Utility Infrastructure, Project #598-22-115. The period of performance is 720 calendar days after issuance of the Notice to Proceed. Location of the work is at the Eugene J. Towbin (EJT) VA Healthcare Center, 2200 Fort Roots Drive, North Little Rock, AR 72114. The point of contact for this notice is Contract Specialist, Julius Jones at Julius.Jones@va.gov.Telephone requests will NOT be accepted.
237110 – Water and Sewer Line and Related Structures Construction. is applicable to the RFP and the Small Business Size Standard is $45M. Interested offerors are asked to first read over the RFP and all its associated attachments/documents in their entirety prior to forwarding any questions to the Contracting Officer. A cut-off time/date for receipt of questions will be established and listed in the RFP, as well as a time/date for the scheduled Site Visit. Only one Site Visit will be conducted and no requests for additional Site visits or make-up Site Visits will be granted.
Amendments to the RFP will not be mailed but will be posted at the SAM.gov website. Offerors are responsible for obtaining the RFP (and associated documents/attachments) from the SAM.gov website and for acknowledging all amendments to the RFP. It is the responsibility of all interested offerors to check the SAM.gov website as necessary for any Amendments to the RFP (to include the day bids are due). In accordance with VAAR 819.7003 Eligibility, at the time of submission of a proposal, the offeror must represent to the Contracting Officer that it is a SDVOSB concern, that it is a small business concern under the NAICS Code assigned to the acquisition, and that it is verified for eligibility in the Small Business Association website (Veteran Small Business Certification (VetCert)) and have the Veterans Small Business Certification. SDVOSB concerns must also be registered in the System for Award Management (SAM) database at www.sam.gov.
OFFERORS ARE ADVISED TO CHECK THE SITE FREQUENTLY AS THEY ARE RESPONSIBLE FOR OBTAINING AMENDMENTS TO THE SOLICITATION NOTICE.
In accordance with FAR Overhaul 5.101(c)(4)(v), equitable adjustments for change orders will be reviewed per FAR 36 and 43.
The contractor shall completely prepare the site for construction operations, including demolition and removal of existing structures, and furnish labor and materials to upgrade the water source, storage, and site distribution system. The project includes adding a new 150,000-gallon elevated water storage tank in the north ballfield area, connecting it to the existing 250,000-gallon tower with new piping, a pump house, pumps, controls, chlorination, and remote monitoring. The existing elevated 250,000-gallon water tower shall be demolished. The project also replaces old failing pipes with new copper or PVC lines, loops the supply network, adds backflow preventers, and includes a new automated control system. All work must conform to current VA, federal, state, and local codes.
We post new plumbing opportunities in Arkansas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""39157""RIDGELAND""MS""USA""715 SOUTH PEAR ORCHARD RD., PLAZA 1""36C25626R0084 0001.pdf"87051"file"".pdf""1""2026-11-19T14:57:29.572+00:00""16714834ae0a440ba622fb7e83338002""public""0""public""7b8bbc69a19347e599bb889d088d2caf""0"18"0""SOLICITATION_36C25626R0084_1.pdf"717580"file"".pdf""1""2026-11-17T15:19:25.501+00:00""ea08a385f01f4b50b98cf6af5510d347""public""0""public""8781ef11b30e4cf39bebfeda5f19adf3""0"17"0""Attachment A_598-22-115 Upgrade Replace Site Utility Infrastructure-Statement of Work.pdf"194169"file"".pdf""1""2026-11-17T15:19:25.501+00:00""b7d0204fc86c4a43bb411ab73079b387""public""0""public""9f0e6904ccd64ec3a3cd0ab14b8008e6""0"16"0""Attachment B_NLR VA Specifications.pdf"7107191"file"".pdf""1""2026-11-17T15:19:25.501+00:00""3c42d366210b48b4b5222cd6f7594155""public""0""public""7959fe11a1a5401ab3f894a8bc8cd668""0"15"0""Attachment C_WATER PLANS.pdf"147731777"file"".pdf""1""2026-11-17T15:19:25.501+00:00""6e5928937a5343d3a95fe321dd68dbf8""public""0""public""b162e8400ef04823b753d9987a5caaf5""0"13"0""Attachment D_Wage Determination AR20260032 05.18.26.pdf"63171"file"".pdf""1""2026-11-17T15:19:25.501+00:00""225dec0fc346417f90c17d50f89e8c0b""public""0""public""0179e828927e493daf11724a4b05966b""0"8"0""Attachment F_EMR Form.pdf"236793"file"".pdf""1""2026-11-17T15:19:25.501+00:00""bedfc90ccfe4452c84dc8e7f8410986a""public""0""public""bc873609d5ce4e35bfa4eef1495676ae""0"6"0""Attachment E_Standard Form 24 - Bid Bond.pdf"737205"file"".pdf""1""2026-11-17T15:19:25.501+00:00""cc907fa591da4209bbe080a37e2cb90a""public""0""public""1b483abc63e04cffb60421b7ba95726a""0"3"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 43f29979f6464699b6fca4d13741bcaa), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.