Light RFP
Austin · Austin, TX

Distribution Getaway Duct Bank Bore at East Village subst

Due Aug 20, 2026·23 days left·General ConstructionView official posting ↗
Issuing agency
City of Austin
Method
Invitation For Bids (IFB)
Category
Construction
PIN
IFB 6100 CLMC1105
Location
Austin, TX
Posted
Jul 9, 2026
Takeaways by LightRFP AI
  • City of Austin seeks bids for the Distribution Getaway Duct Bank Bore at East Village Substation.
  • The project includes approximately 342 linear feet of 36-inch jack and bore with 12-5 inch carrier pipes in groundwater conditions.
  • Additional work comprises 386 linear feet of 12-5 inch open cut duct bank, 79 linear feet of 2-5 inch open cut duct bank, and two 12'x12' manholes.
  • The estimated cost for the solicitation is $1,114,570.00.
  • Bids and compliance plans are due prior to 2:00 PM on 08/20/2026, with bid opening at 3:00 PM on 08/20/2026.
  • All work must be substantially completed within 90 working days after the Notice to Proceed.
  • Requirement: A bid guaranty of not less than five percent (5%) of the total bid must accompany the bid.
  • Requirement: Performance and payment bonds are required, each in the amount of one hundred percent (100%) of the Contract Amount.
  • Requirement: MBE/WBE or DBE Compliance Plan must be submitted with the bid; goals include 3.56% WBE, 0.54% African American, 2.22% Hispanic American, and 3.94% Native/Asian American.
  • Requirement: Minimum wage rates have been established per Section 00830.

AI-generated, verify all details against the official documents.

Description

The Work shall include furnishing all tools, labor, materials, equipment, and
miscellaneous items necessary for the complete construction of approximately 342 linear foot 36-inch jack and bore with 12-5 inch carrier pipes (grouted within the casing pipe) in ground water conditions. The work also includes 386 linear feet of 12-5 inch open cut duct bank, 79 linear feet of 2-5 inch open cut duct bank, two 12’x12’ manholes and typical erosion and sedimentation control and revegetation. Austin Energy will install the conductors at the project completion.

Estimated Amount: $1,114,570.00

Special Notes: Compliance Plan Required.

Documents18
IFB_6100_CLMC1105_00900_14_v1.pdfPDF
IFB_6100_CLMC1105_00900_13_v1.pdfPDF
IFB_6100_CLMC1105_00900_12_v1.pdfPDF
IFB_6100_CLMC1105_00900_11_v1.pdfPDF
IFB_6100_CLMC1105_00900_10_v1.pdfPDF
IFB_6100_CLMC1105_00900_9_v1.pdfPDF
IFB_6100_CLMC1105_00900_8_v1.pdfPDF
IFB_6100_CLMC1105_00900_7_v1.pdfPDF
IFB_6100_CLMC1105_00900_6_v1.pdfPDF
IFB_6100_CLMC1105_00900_5_v1.pdfPDF
IFB_6100_CLMC1105_00900_4_v1.pdfPDF
IFB_6100_CLMC1105_00900_3_v1.pdfPDF
IFB_6100_CLMC1105_00900_2_v1.pdfPDF
IFB_6100_CLMC1105_00900_1_v1.pdfPDF
IFB_6100_CLMC1105_PBA_v1.pdfPDF
IFB_6100_CLMC1105_BID_DOC_v1.pdfPDF
IFB_6100_CLMC1105_MWDBE_PAC_v1.pdfPDF
IFB_6100_CLMC1105_PLANS_v1.pdfPDF

Contact

Name
Francisco Gonzalez
Phone
(512) 974-7181
Address
Austin, TX
Full source recordfrom City of Austin
Sid
142008
Type
Invitation For Bids (IFB)
Title
Distribution Getaway Duct Bank Bore at East Village subst
Fields
WBE
3.56%
Type
Invitation For Bids (IFB)
Status
Open
Summary
The Work shall include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of approximately 342 linear foot 36-inch jack and bore with 12-5 inch carrier pipes (grouted within the casing pipe) in ground water conditions. The work also includes 386 linear feet of 12-5 inch open cut duct bank, 79 linear feet of 2-5 inch open cut duct bank, two 12’x12’ manholes and typical erosion and sedimentation control and revegetation. Austin Energy will install the conductors at the project completion.
Description
Distribution Getaway Duct Bank Bore at East Village subst
Response Due
Prior to 08/20/2026, 02:00 PM Please review the Solicitation Insgtructions for submission requirements
Special Notes
Compliance Plan Required.
African American
0.54%
Response Opening
08/20/2026, 03:00 PM See Section 00020, Item 3 - Submission of Bids
Hispanic American
2.22%
Compliance Plan Due
Prior to 08/20/2026 02:00 PM Required Please review the Solicitation Insgtructions for submission requirements
Solicitation Number
IFB 6100 CLMC1105
Native/Asian American
3.94%
Solicitation Specific Questions
Olga Jimenez (512) 9747988 olga.jimenez@austintexas.gov
Estimated Amount For Solicitation
$1,114,570.00
Small Minority Business Resources Questions
Veronica Hawkins (512) 9749113 smbrcompliancedocuments@austintexas.gov
Authorized Contact Names: Project Related Questions
Francisco Gonzalez (512) 974-7181 francisco.gonzalez@austinenergy.com
Important Solicitation Dates: Solicitation Published
07/21/2025 07:20 AM
Vendor Meetings/Conference, Site Visits (Date/Time): Meeting
07/29/2025, 10:00 AM To attend Virtual Pre-Bid, see Section 00020 for Meeting Link.
Number
IFB 6100 CLMC1105
Status
Open
Due Date
Aug 20, 2026
Summary
The Work shall include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of approximately 342 linear foot 36-inch jack and bore with 12-5 inch carrier pipes (grouted within the casing pipe) in ground water conditions. The work also includes 386 linear feet of 12-5 inch open cut duct bank, 79 linear feet of 2-5 inch open cut duct bank, two 12’x12’ manholes and typical erosion and sedimentation control and revegetation. Austin Energy will install the conductors at the project completion.
Est Amount
$1,114,570.00
Contact Name
Francisco Gonzalez
Contact Email
francisco.gonzalez@austinenergy.com
Contact Phone
(512) 974-7181
Special Notes
Compliance Plan Required.
Document Links
https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1105/IFB_6100_CLMC1105_00900_14_v1.pdf, https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1105/IFB_6100_CLMC1105_00900_13_v1.pdf, https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1105/IFB_6100_CLMC1105_00900_12_v1.pdf, https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1105/IFB_6100_CLMC1105_00900_11_v1.pdf, https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1105/IFB_6100_CLMC1105_00900_10_v1.pdf, https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1105/IFB_6100_CLMC1105_00900_9_v1.pdf, https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1105/IFB_6100_CLMC1105_00900_8_v1.pdf, https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1105/IFB_6100_CLMC1105_00900_7_v1.pdf, https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1105/IFB_6100_CLMC1105_00900_6_v1.pdf, https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1105/IFB_6100_CLMC1105_00900_5_v1.pdf, https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1105/IFB_6100_CLMC1105_00900_4_v1.pdf, https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1105/IFB_6100_CLMC1105_00900_3_v1.pdf, https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1105/IFB_6100_CLMC1105_00900_2_v1.pdf, https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1105/IFB_6100_CLMC1105_00900_1_v1.pdf, https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1105/IFB_6100_CLMC1105_PBA_v1.pdf, https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1105/IFB_6100_CLMC1105_BID_DOC_v1.pdf, https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1105/IFB_6100_CLMC1105_MWDBE_PAC_v1.pdf, https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1105/IFB_6100_CLMC1105_PLANS_v1.pdf

Source: City of Austin (solicitation AUSTIN_TX-142008), retrieved via Austin Finance Online (AFO). View the official posting — always confirm requirements and deadlines with the issuing agency.