All items necessary for the construction of Phase 3B Estates, Phase 3A Estates, and Phase 3A Villas including all utility work for installing storm, water, and wastewater pipe and appurtenances; manholes, inlets, headwalls and other various required structures; excavation and embankment; street improvements; erosion & sedimentation controls; revegetation; and various other improvements.
Pre-bid meeting: November 3, 2026 at 10:00 AM (Chicago) — 2600 Via Fortuna, Suite 100 Austin, TX 78746 — Optional
Bid opening: November 17, 2026 at 10:00 AM (Chicago) — 2600 Via Fortuna, Suite 100 Austin, TX 78746
Questions asked: 1
Bid documents (download requires a free CivCast account):
All items necessary for the construction of Phase 3B Estates, Phase 3A Estates, and Phase 3A Villas including all utility work for installing storm, water, and wastewater pipe and appurtenances; manholes, inlets, headwalls and other various required structures; excavation and embankment; street improvements; erosion & sedimentation controls; revegetation; and various other improvements.
We post new asphalt opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>The Owner reserves the right to award all three projects to a single contractor or to award separate contracts to multiple contractors.</p>""95ee051c-c262-44f7-a020-7c114cab0c46""2026-10-23T16:02:57.03Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6adb7eb1e614926712a66ad6), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.