Missouri State Line – Hwy. 62 (S) — Baxter County | 101 | AM.
Route(s): 101.
Letting November 4, 2026 (bids due 10:00 AM).
ARKANSAS DEPARTMENT OF TRANSPORTATION
A90050
MISSOURI STATE LINE – HWY. 62 (S)
FEDERAL AID PROJECT STPR-HRRR-0003(59)
THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 10.552 MILES OF HIGHWAY 101 IN BAXTER COUNTY.
THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, EARTHWORK, TRENCHING AND SHOULDER PREPARATION,
AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM
PATCHING OF EXISTING ROADWAY, APPROACH GUTTERS, MAINTENANCE OF TRAFFIC, MINOR DRAINAGE STRUCTURES,
GUARDRAIL, EROSION CONTROL, MUMBLE STRIPS AND STRIPES, PAVEMENT MARKING, AND MISC. ITEMS.
ROUTES: 101
SECTIONS: 1
COUNTY: BAXTER
LENGTH: 10.552 miles in length.
THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:
202049 R&D OF PIPE CULVERTS 735.00 LF
202093 R&D OF DROP INLETS 1.00 EACH
202097 R&D OF BOX CULVERTS 3.00 EACH
202132 R&D OF GUARDRAIL 750.00 LF
210213 UNCLASSIFIED EXCAVATION 15.00 CUYD
210611 COMPACTED EMBANKMENT 60.00 CUYD
215011 TRENCH.AND SHOULDER PREP. 471.00 STA
303117 AGGR.BASE COURSE(CLASS 7) 692.00 TON
401011 TACK COAT 29,357.00 GAL
406161 M.A. IN ACHM BINDER(1") 3,302.00 TON
406412 A.B.(PG70-22)ACHM BINDER(1") 152.00 TON
407161 MA IN ACHM SURFACE(3/8") 19,797.00 TON
407441 AB(PG70-22)ACHM SURF(3/8") 1,286.00 TON
412002 COLD MILLING ASPHALT PVMT. 1,701.00 SQYD
415011 ACHM PATCH.EXIST.RDWY. 160.00 TON
504264 APPROACH GUTTERS 88.92 CUYD
601001 MOBILIZATION 1.00 L.S.
603009 MAINTENANCE OF TRAFFIC 1.00 L.S.
604003 SIGNS 1,149.00 SQFT
604023 TRAFFIC DRUMS 202.00 EACH
604041 CONST.PAVEMENT MARKINGS 475,922.00 LF
604045 CONST.PAVEMENT MARKINGS (WORD) 2.00 EACH
604046 CONST.PAVEMENT MARKINGS (ARROW) 2.00 EACH
604049 TUBULAR MARKERS 11.00 EACH
604055 REMOVAL OF CONST.PVMT.MRK. 7,054.00 LF
604061 REMOVAL OF PERM.PVMT.MRK.
The project consists of removal and disposal items, earthwork, trenching and shoulder preparation, aggregate base course, ACHM binder and surface courses, cold milling asphalt pavement, ACHM patching of existing roadway, approach gutters, maintenance of traffic, minor drainage structures, guardrail, erosion control, rumble strips and stripes, pavement marking, and miscellaneous items. Quantities include 29,357 gallons of tack coat, 3,302 tons of ACHM binder, 19,797 tons of ACHM surface, 1,701 square yards of cold milling asphalt pavement, 475,922 linear feet of construction pavement markings, and 872 linear feet of 24-inch R.C. pipe culverts, among others.
We post new asphalt opportunities in Arkansas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Arkansas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Arkansas Department of Transportation (solicitation A90050), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.