Hwys. 61/140 Inters. Impvts. (Osceola) (S) — Mississippi County | 61 & 140 | PM.
Route(s): 61 & 140.
Letting November 4, 2026 (bids due 10:00 AM).
ARKANSAS DEPARTMENT OF TRANSPORTATION
101141
HWYS. 61/140 INTERS. IMPVTS. (OSCEOLA) (S)
FEDERAL AID PROJECT STPSC-9326(7) & 9030
THE PURPOSE OF THIS PROJECT IS TO IMPROVE THE INTERSECTION ON HIGHWAYS 61 AND 140 IN MISSISSIPPI COUNTY.
THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, STONE BACKFILL, EARTHWORK, AGGREGATE BASE
COURSE, ACHM BASE, BINDER, AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, PORTLAND CEMENT
CONCRETE DRIVEWAY, MAINTENANCE OF TRAFFIC, CONCRETE DITCH PAVING, MINOR DRAINAGE, EROSION CONTROL,
CONCRETE ISLAND, WALKS, AND CURB, WHEELCHAIR RAMPS, TRAFFIC SIGNAL ITEMS, PAVEMENT MARKINGS, AND
MISC. ITEMS.
ROUTES: 61 & 140
SECTIONS: 2 & 2
COUNTY: MISSISSIPPI
LENGTH: 0.263 mile in length.
THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:
202001 R&D OF CURB 990.00 LF
202003 R&D OF CURB AND GUTTER 330.00 LF
202042 R&D OF CONCRETE PAVEMENT 316.00 SQYD
202047 R&D OF CONCRETE ISLANDS 418.00 SQYD
202062 R&D OF CONCRETE DRIVEWAYS 1,846.00 SQYD
202072 R&D OF WALKS 11.00 SQYD
202093 R&D OF DROP INLETS 1.00 EACH
202096 R&D OF PIPE CULVERTS 11.00 EACH
202099 R&D OF HEADWALLS 1.00 EACH
207011 STONE BACKFILL 45.00 TON
210213 UNCLASSIFIED EXCAVATION 669.00 CUYD
210611 COMPACTED EMBANKMENT 2,646.00 CUYD
210702 SOIL STABILIZATION 100.00 TON
303117 AGGR.BASE COURSE(CLASS 7) 201.00 TON
309505 P.C.CONCRETE BASE-5" 300.00 SQYD
401011 TACK COAT 1,861.00 GAL
405161 M.A. IN ACHM BASE COURSE(1.5") 606.00 TON
405412 A.B.(PG70-22)ACHM BASE(1.5") 24.00 TON
406161 M.A. IN ACHM BINDER(1") 356.00 TON
406412 A.B.(PG70-22)ACHM BINDER(1") 15.00 TON
407162 MA IN ACHM SURFACE(1/2") 2,997.00 TON
407452 AB(PG76-22)ACHM SURF(1/2") 171.00 TON
412002 COLD MILLING ASPHALT PVMT. 4,490.00 SQYD
414011 ASPH.CONC.PATCH-MAINT.
Improve the intersection on Highways 61 and 140 in Mississippi County over 0.263 mile, including removal and disposal of curb, pavement, islands, driveways, walks and drainage structures, earthwork and stone backfill, aggregate base, ACHM base, binder and surface courses, cold milling, Portland cement concrete driveway and base, maintenance of traffic, concrete ditch paving, drop inlets and pipe culverts, erosion control, concrete island, walks, curb and gutter, wheelchair ramps, traffic signal poles, heads, controllers, detection, lighting and conductors, pavement markings and miscellaneous items.
We post new asphalt opportunities in Arkansas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Arkansas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Arkansas Department of Transportation (solicitation 101141), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.