Hwy. 67B – Hwy. 13 (S) — White County | 367 | PM.
Route(s): 367.
Letting November 4, 2026 (bids due 10:00 AM).
ARKANSAS DEPARTMENT OF TRANSPORTATION
A50033
HWY. 67B – HWY. 13 (S)
FEDERAL AID PROJECT STPF-0073(94)
THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY AND PLACE ULTRATHIN BONDED WEARING COURSE ON
APPROXIMATELY 5.952 MILES OF HIGHWAY 367 IN WHITE COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND
DISPOSAL OF GUARDRAIL, AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, ULTRATHIN BONDED
WEARING COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF
TRAFFIC, GUARDRAIL, EROSION CONTROL, RUMBLE STRIPES, LOOP WIRING, PAVEMENT MARKING, AND MISC. ITEMS.
ROUTES: 367
SECTIONS: 15
COUNTY: WHITE
LENGTH: 5.952 miles in length.
THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:
202132 R&D OF GUARDRAIL 1,450.00 LF
303117 AGGR.BASE COURSE(CLASS 7) 327.00 TON
401011 TACK COAT 7,506.00 GAL
406161 M.A. IN ACHM BINDER(1") 124.00 TON
406412 A.B.(PG70-22)ACHM BINDER(1") 6.00 TON
407162 MA IN ACHM SURFACE(1/2") 7,717.00 TON
407442 AB(PG70-22)ACHM SURF(1/2") 458.00 TON
407904 ULTRATHIN BONDED WEARING CRS (3/4"-TY C) 2,040.00 TON
412002 COLD MILLING ASPHALT PVMT. 68,694.00 SQYD
415011 ACHM PATCH.EXIST.RDWY. 500.00 TON
601001 MOBILIZATION 1.00 L.S.
603009 MAINTENANCE OF TRAFFIC 1.00 L.S.
604003 SIGNS 1,244.00 SQFT
604023 TRAFFIC DRUMS 36.00 EACH
604041 CONST.PAVEMENT MARKINGS 130,333.00 LF
604045 CONST.PAVEMENT MARKINGS (WORD) 4.00 EACH
604046 CONST.PAVEMENT MARKINGS (ARROW) 4.00 EACH
604061 REMOVAL OF PERM.PVMT.MRK. 1,525.00 LF
617005 GUARDRAIL (TYPE A) 1,450.00 LF
617312 GUARDRAIL TERMINAL (TYPE 2) 12.00 EACH
617332 THRIE BEAM GUARDRAIL TERMINAL 12.00 EACH
621021 SILT FENCE 500.00 LF
635011 ROADWAY CONSTRUCTION CONTROL 1.00 L.S.
642102 CENTERLINE RUMBLE STRIPES IN ASPH.
Mill and overlay approximately 5.952 miles of Highway 367 in White County and place ultrathin bonded wearing course, including removal and disposal of guardrail, aggregate base course, ACHM binder and surface courses, cold milling asphalt pavement, ACHM patching of existing roadway, maintenance of traffic, guardrail and terminals, erosion control, rumble stripes, loop wiring, pavement marking and miscellaneous items per the listed quantities.
We post new asphalt opportunities in Arkansas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Arkansas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Arkansas Department of Transportation (solicitation A50033), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.