Hwy. 412 Impvts. (Carroll & Madison Cos.) (S) — Carroll County | 412 | PM.
Route(s): 412.
Letting November 4, 2026 (bids due 10:00 AM).
ARKANSAS DEPARTMENT OF TRANSPORTATION
A90051
HWY. 412 IMPVTS. (CARROLL & MADISON COS.) (S)
FEDERAL AID PROJECT NHPP-0844(5)
THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 11.203 MILES OF HIGHWAY 412 IN CARROLL
AND MADISON COUNTIES. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF GUARDRAIL, ACHM SURFACE
COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC,
GUARDRAIL, RUMBLE STRIPS AND STRIPES, PAVEMENT MARKING, AND MISC. ITEMS.
ROUTES: 412
SECTIONS: 3, 4, & 5
COUNTY: CARROLL & MADISON
LENGTH: 11.203 miles in length.
THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:
202132 R&D OF GUARDRAIL 3,000.00 LF
401011 TACK COAT 29,885.00 GAL
407162 MA IN ACHM SURFACE(1/2") 31,032.00 TON
407452 AB(PG76-22)ACHM SURF(1/2") 1,841.00 TON
412002 COLD MILLING ASPHALT PVMT. 297,066.00 SQYD
415011 ACHM PATCH.EXIST.RDWY. 300.00 TON
601001 MOBILIZATION 1.00 L.S.
603010 MAINTENANCE OF TRAFFIC 1.00 L.S.
604003 SIGNS 1,707.00 SQFT
604041 CONST.PAVEMENT MARKINGS 269,915.00 LF
617005 GUARDRAIL (TYPE A) 2,200.00 LF
617312 GUARDRAIL TERMINAL (TYPE 2) 14.00 EACH
617332 THRIE BEAM GUARDRAIL TERMINAL 4.00 EACH
635011 ROADWAY CONSTRUCTION CONTROL 1.00 L.S.
642001 RUMBLE STRIPS IN ASPHALT SHOULDERS 61,289.00 LF
642011 RUMBLE STRIPES IN ASPHALT SHOULDERS 39,811.00 LF
642102 CENTERLINE RUMBLE STRIPES IN ASPH. RDWYS 50,550.00 LF
719002 THERMO.PVMT.MARK.WH(6") 132,510.00 LF
719005 THERMO.PVMT.MARK.WH(12") 2,895.00 LF
719102 THERMO.PVMT.MARK.YL(6") 125,065.00 LF
719201 THERMO.PVMT.MARK.(WORD) 4.00 EACH
719202 THERMO.PVMT.MARK.(ARROW) 8.00 EACH
721002 RAISED PAVEMENT MARKERS-2 1,115.00 EACH
THE SUCCESSFUL BIDDER WILL BE REQUIRED TO COMPLETE THIS CONTRACT ON OR BEFORE November 24, 2027.
Mill and overlay Highway 412 including removal and disposal of guardrail, ACHM surface course, cold milling asphalt pavement, ACHM patching of existing roadway, maintenance of traffic, guardrail with terminals, rumble strips and stripes and centerline rumble stripes, thermoplastic pavement markings, raised pavement markers, signs, construction pavement markings, mobilization and roadway construction control.
We post new asphalt opportunities in Arkansas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Arkansas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Arkansas Department of Transportation (solicitation A90051), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.