BRACKISH GROUNDWATER NATIONAL DESALINATION RESEARCH FACILITY YARD PIPING AND FLOW MEASUREMENT UPGRADES - Amendment 00002 is to provide solicitation Questions and Answers and extend the Phase One due date.
The project requires design and construction of upgrades to site source water, potable water, and concentrate water piping and flow measurement infrastructure, including a TP10 Flow Measurement Vault with magnetic flow meters, replacement of damaged pipeline sections, installation of piping manifolds and CW drain piping to a CW Vault with valving manifold, installation of flow meters at TP7 and a Well 2/4 bypass line, modification and consolidation of piping at test pads TP7, 8, and 9, installation of four concrete vaults at existing valve vaults, SCADA integration and controls cabling, temperature-controlled heat trace and insulation for piping, and testing, training, and commissioning of the completed system. An optional line item covers locating and repairing leaks along up to 500 feet of the SWST2 pipeline.
We post new plumbing opportunities in New Mexico as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""87102""ALBUQUERQUE""NM""USA""505 MARQUETTE AVE NW""SUITE 1313""Sol_140R4025R0017_Amd_0002.pdf"207844"file"".pdf""1""2026-10-28T19:37:34.916+00:00""626f5cc17e0649d9a2b79b4cea67b381""public""0""public""b3275d39e7e3414e9676ba99a01641f1""0"8"0""Amendment_2_-_Questions_Answers_140R4025R0017_0002.pdf"117345"file"".pdf""1""2026-10-28T19:37:34.916+00:00""eb150305ced247cca96f8ff0f86268d7""public""0""public""0b4fbaa0e56f44d193e9fa5e8c6ec26b""0"7"0""Sol_140R4025R0017_rev_10-23-2026_0002.pdf"626589"file"".pdf""1""2026-10-28T19:37:34.916+00:00""c345b1e56b4543adbe0f965f40ea71b1""public""0""public""5ab25e9efceb49e18f3013f8975e4072""0"6"0""Sol_140R4025R0017_Amd_0001.pdf"207199"file"".pdf""1""2026-10-09T18:11:02.504+00:00""04d0b8b2e4ad43b695068c9767185a6f""public""0""public""fb962413dc8b4c1fb2cbefefe0bc9c21""0"5"0""Amendment_1_-_Question_Answer_140R4025R0017_0001.pdf"102698"file"".pdf""1""2026-10-09T18:11:02.504+00:00""8d847f39841a4f1b9e4f0209cf47447e""public""0""public""d96be141762240578a16499c7c06d0cf""0"4"0""Sol_140R4025R0017.pdf"764831"file"".pdf""1""2026-10-07T17:21:48.741+00:00""a7ab7bf7a9394612b6c97505140a5905""public""0""public""ca5d5e292db84c558628385cd9162833""0"3"0""Attachment_2_-Past_Performance_Questionnaire.docx"27140"file"".docx""1""2026-10-07T17:21:48.741+00:00""664c263a5ff94e608bf34309aef7ba84""public""0""public""465f4bc80e3d40ec9be507a8915d2a0b""0"2"0""Attachment_1_-_Statement_of_Objectives_rev.pdf"1940870"file"".pdf""1""2026-10-07T17:21:48.741+00:00""551a361a73244539a4b7d3fb2163df61""public""0""public""3d96e2ca5e684d0483bd98899c9d5ab0""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 785202ad4ff54dac80283300ed297c21), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.