EO 14398 NGWSP Cutter Lateral Reach 21 Booster Plant
The principal components of work include: 1. Pre-engineered concrete booster pump station, concrete foundation pad, pipe encasement, yard pipe, fencing, electrical equipment, gravel surfacing, and pipe connections. 2. Installation of secondary regulation tank at Regulation Tank No. 3 site, foundation, electrical equipment, yard pipe, and pipe connections. 3. Erosion and scour restoration/prevention: a. Includes a retaining wall, swale, runoff channel, and site regrading. 4. Reinstallation of gravel surfacing at Regulation Tank No. 3 site. 5. Supervisory Control and Data Acquisition (SCADA) equipment and radio communications system.
We post new plumbing opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""84138""SALT LAKE CITY""UT""USA""125 SOUTH STATE ST""ROOM 8100""Sol_140RR027B0004.pdf"290435"file"".pdf""1""2026-11-02T21:22:46.312+00:00""1961fd0c39934eefb68b5eb4c357782c""public""0""public""76cda4f3ccb444b5915f4c3fa4d0e3f5""0"7"0""Attachment_1_-_00_00_01A_Specifications_DZ_Booster_06162026_Final_654_pg.pdf"19583498"file"".pdf""1""2026-11-02T21:22:46.312+00:00""1c8cad7e05254306b485d3c9b2831edf""public""0""public""533b9ab7a0d543c0a68bbc0e8e41aa53""0"6"0""140R4027B0004_NGWSP_R21_CL_Booster_Plant_solicitation_2Nov26.pdf"1523011"file"".pdf""1""2026-11-02T21:22:46.312+00:00""c92c5c5717774c519b9b1e2a86dbec2f""public""0""public""0caa2494609040729f81c5f102868765""0"5"0""Attachment_2_-_00_00_02_100__DRAWINGS_34x22_20261027_rev_Final_97_pg.pdf"47465817"file"".pdf""1""2026-11-02T21:22:46.312+00:00""59feccc6b1b54790b4aaeb3bcba9c95c""public""0""public""e12733c567354ebf8561d2c86ae9be56""0"4"0""Attachment_3_-_NM20260040_Heavy_-_wage_determination_-_4_pages.pdf"60918"file"".pdf""1""2026-11-02T21:22:46.312+00:00""036fa06deba449c18ac8fa4cc2b0eb4b""public""0""public""0094b50047704f7999aa1778d8fbbf3c""0"3"0""Attachment_4_-_NM20260046_Building_-_wage_determination_-_4_pages.pdf"60936"file"".pdf""1""2026-11-02T21:22:46.312+00:00""03123487a01a4f3baef49b7c82ee6429""public""0""public""1c3fd41d3fdc4d86ac2b7f829a217b31""0"2"0""Attachment_5_-_Construction_Contract_Administration.pdf"419258"file"".pdf""1""2026-11-02T21:22:46.312+00:00""47a90e3b191943cf96c67d1ebe3e0548""public""0""public""417c657ac87e4b1c9886316817dcf585""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice d20f39b306754b988e0b0b9e2983aad9), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.