Please see the following page for the solicitation 36C24227R0009 regarding Replace Chilled Water Pump at the Boiler Plant JJP VAMC Bronx, NY.
The contractor shall furnish all labor, supervision, equipment, materials, tools, rigging, transportation, and incidentals necessary to complete the approved replacement work and deliver an operational system. The work includes removal of the existing pump and motor, furnishing and installing a new pump and motor, electrical power connections, piping insulation, startup, and testing. The contractor must verify the existing pump location and configuration before ordering equipment, coordinate shutdowns with VA Engineering, and complete the work within 180 calendar days from the Notice to Proceed.
We post new plumbing opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""12208""ALBANY""NY""USA""113 HOLLAND AVE""WAGE DETERMINATION BRONX 8-13-2026.pdf"61903"file"".pdf""1""2026-10-29T16:38:30.379+00:00""931df14392af481f8cff13d4fe191734""public""0""public""1e603849c66d4a1787c72beb183187d6""0"4"0""S02 852.219-75 Limitation on Subcontracting Jan 2023- Blank.docx"16888"file"".docx""1""2026-10-29T16:38:30.379+00:00""51ab7c3ae0434361bbeacbf2829bbef1""public""0""public""38f20e31f7f045c09a41bd3900351d65""0"3"0""Buy American Certificate 52.225-9.pdf"129844"file"".pdf""1""2026-10-29T16:38:30.379+00:00""4ab52341306a4829a9602061aa2edda0""public""0""public""d7ff87f448ed4209a2bc1eebe4c18105""0"2"0""36C24227R0009_1.docx"116345"file"".docx""1""2026-10-29T16:38:30.379+00:00""d4f8300c35d84900ac1f13d0a1313712""public""0""public""d5fd2d40928b419eb4c4a87ff0b393e9""0"1"0""https://www.va.gov/"0"link""1""2026-10-29T16:38:30.379+00:00""8c6f398855ae48af9757037e54dc988a""public""0""VA Homepage""public""861db4cb47cb41a084a8d835804c9732""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 7690ea3b8df94f67b844f4e92131d250), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.