Kelly Pierson OSS
The Contractor shall install 4-inch solid sewer pipe, an underground two-way cleanout, one 1,200-gallon single-compartment concrete trash tank, one concrete advanced treatment unit (ATU), NuWater Advanced Treatment BNR-500 or equivalent, one 1,200-gallon single-compartment pump tank with a pump (Liberty Pumps 280 Series, 1/2-hp submersible effluent pump or equivalent) and control panel, 2-inch PVC Schedule 40 effluent transport pipe, and a pressurized gravel trench drainfield with 1.25-inch laterals. The Contractor shall pump, decommission and abandon the existing septic tank in accordance with all applicable federal, state, and local regulations.
We post new plumbing opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"20201""Washington""DC""US""Hubert H. Humphrey Building 200 Independence Avenue, SW ""20852""Rockville""MD""US""The Reyes Building 801Thompson Avenue, Suite 400""98121""SEATTLE""WA""USA""2201 6TH AVENUE""MAIL STOP RX-24""6-US DOL WD WA20260085 Dated 5-18-2026.pdf"37382"file"".pdf""1""2026-10-29T18:21:02.22+00:00""4f44363831bc499bb5cae41c95cd0a6e""public""0""public""aa7e01f09b624afc99fc89be9d53b1b6""0"8"0""5-Measurement and Payment.pdf"53822"file"".pdf""1""2026-10-29T18:21:02.22+00:00""4105bed756e548dc894ee9d0d2f9cb07""public""0""public""1c80a01038b248dbab4e67b12189abf7""0"7"0""4-Location Aerial.pdf"336400"file"".pdf""1""2026-10-29T18:21:02.22+00:00""6782c0e977b24d4e8fb14522f086ddfe""public""0""public""36fa32e93b364f63aa8f397e4f155487""0"6"0""3-Technical Specifications.pdf"246588"file"".pdf""1""2026-10-29T18:21:02.22+00:00""53c1a7899e774bee8acc230626d6bb82""public""0""public""cf8b8f73428e45dd985a441a0e396dc1""0"5"0""2-Septic Design.pdf"17194045"file"".pdf""1""2026-10-29T18:21:02.22+00:00""b3dfc4a560ba47ab9939188a892e96fc""public""0""public""b4ab6218bd1d4046a2c060ec7e19302e""0"4"0""1-Statement of Work.docx"26706"file"".docx""1""2026-10-29T18:21:02.22+00:00""dbce16812c9642c79155987cf436b5ec""public""0""public""6ec40bb40b734e96a1e78c57b52139c7""0"3"0""B01 75H70127Q00001.pdf"976318"file"".pdf""1""2026-10-29T18:21:02.22+00:00""8413d37427b24d69815c899f53b2405f""public""0""public""40b12a6015e14c679df8b702db85a6af""0"2"0""A11 Pre-Solicitation SAM Notice.pdf"142016"file"".pdf""1""2026-10-29T18:21:02.22+00:00""dbcccb4163de45f4bd54c72e65d1b136""public""0""public""ceda53e9b1cf41f0b00c7fede19b8e57""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 58e9db01f3d34a4da72292efec5a40c6), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.