The Work includes, but is not limited to, the following: Mechanical, Plumbing and HVAC work, as well as related electrical controls. The Contractor shall perform all the Work required by the Contract and each Work Authorization for various project including specifications, drawings or other technical data provided. The Work includes but is not limited to the following: Mechanical, Plumbing and HVAC work for various locations.
Within 72 hours (3 business days) of receiving written request from the Port of Seattle, the Contractor shall furnish all cost estimates, which shall contain estimates for labor, tools, equipment, materials, and incidentals necessary to perform work as required by the Work Authorization (WA). See Document 01 11 00 – Summary of Work for additional details. This contract is for Work to be performed at various Port-wide sites within the Seattle-Tacoma International Airport and surrounding vicinities.
The work will be assigned in a written Work Authorization (WA) by a POS Construction Manager. The WA will address the scope of work, the estimated value of the work, and time of completion. The Work, as directed by the WA, shall be performed in accordance with industry standards and all applicable federal, state, and local regulations.
The Contractor shall furnish all labor, tools, equipment, materials, and incidentals necessary to perform the work as requested by the Port of Seattle via a Work Authorization. All Contractor labor shall be provided as defined by the labor classifications per the Schedule of Unit Prices listed in Document 00 41 00 – Bid Form. The contract will be awarded for an estimated amount not to exceed $1,620,000.00, which excludes Washington State Sales Tax.
The Work includes, but is not limited to, the following: Mechanical, Plumbing and HVAC work, as well as related electrical controls. The Contractor shall perform all the Work required by the Contract and each Work Authorization for various project including specifications, drawings or other technical data provided. The Work includes but is not limited to the following: Mechanical, Plumbing and HVAC work for various locations. Within 72 hours (3 business days) of receiving written request from the Port of Seattle, the Contractor shall furnish all cost estimates, which shall contain estimates for labor, tools, equipment, materials, and incidentals necessary to perform work as required by the Work Authorization (WA). The Contractor shall furnish all labor, tools, equipment, materials, and incidentals necessary to perform the work as requested by the Port of Seattle via a Work Authorization. All Contractor labor shall be provided as defined by the labor classifications per the Schedule of Unit Prices listed in Document 00 41 00 – Bid Form.
We post new hvac opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Washington work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Port of Seattle — Port Construction Services (solicitation d515dcbb-77c6-f111-bd4c-005056aa9c71), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.