The Millvale LPP was constructed by U.S. Army Corps of Engineers (USACE) in 1980 under the authority of Section 205 of the Flood Control Act of 1948 as amended. The project consists of about 6,200 feet of channel improvement including concrete gravity retaining walls, concrete wall supports, anchored concrete toe blocks, concrete cap walls, stone-filled gabion mattresses, flap gates and access ramps. The LPP is an urban Flood Control Work (FCW), and it is not a multipurpose project.
Heavy rains from 1-12 April 2024 caused flooding which damaged the Project within Girtys Run, including bank erosion, shoaling, erosion of the improved channel, ruptured gabion baskets, washed-out concrete buttresses, and erosion of grouted riprap. Of particular concern are the washed-out buttresses which have migrated to the center of the improved channel, impeding streamflow. If the buttresses are not removed and stream bank improvements continue to deteriorate, there is a risk that debris will continue to accumulate and could ultimately damage the channel downstream of the impediment.
To address these damages, Allegheny County requested rehabilitation assistance from USACE through the PL 84-99 program, which authorizes USACE to rehabilitate eligible Federal and non-Federal LPPs damaged or destroyed by floods. An agreement was signed on 6 August 2025 between the Borough of Millvale and USACE to complete the necessary repairs. The work is to be completed within 365 calendar days after written Notice to Proceed (NTP).
The Anticipated Construction Cost is between $300,000.00 and $350,000.00. The North American Industrial Classification Code (NAICS) is 237990 - Other Heavy and Civil Engineering Construction. The Small Business Size Standard is $45,000,000.00. Any resultant award will be for one (1) Firm-Fixed-Price (FFP) Purchase Order. The anticipated award date is 22 December 2026.
The basis of award will be of best value to the Government. Quotes will be evaluated in accordance with (IAW) RFO Part 13 and 36, price and past performance. The Government reserves the right to reject any quotes that exceed available funds for this requirement.
Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on View FFP Contract Changes Playbook Here.
The project involves rehabilitating approximately 6,200 feet of channel improvements along Girtys Run in the Borough of Millvale, including concrete gravity retaining walls, concrete wall supports, anchored concrete toe blocks, concrete cap walls, stone-filled gabion mattresses, flap gates and access ramps. Damage from April 2024 flooding includes bank erosion, shoaling, erosion of the improved channel, ruptured gabion baskets, washed-out concrete buttresses, and erosion of grouted riprap. The washed-out buttresses have migrated to the center of the improved channel, impeding streamflow, and work must address removal and repair to prevent further debris accumulation and downstream damage. The work must be completed within 365 calendar days after written Notice to Proceed.
We post new excavating opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"15222-4198""PITTSBURGH""PA""USA""WILLIAM S MOORHEAD FEDERAL BUILDING""1000 LIBERTY AVE RM 727""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911WN27QA004¬iceType=SolicitationNotice"0"link""1""2026-11-06T15:57:50.023+00:00""654cd85f5b6a47c2b2cff49896562dfb""public""0""PIEE Solicitation Module Link for W911WN27QA004""public""7d798c22e0f2447d9d51d7ec5b64fd55""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-11-06T15:57:50.023+00:00""17052a9f29a24597a6d859a8d5eee83b""public""0""Web Based Training for the PIEE Solicitation Module""public""db0184c8739c4d7e9211827d4ad1ae0b""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-11-06T15:57:50.023+00:00""f9dd66bdee694bce97464032213f0c2c""public""0""Registration Instructions for the PIEE Solicitation Module""public""5885ca2790a74be999a686e7b4aaccfa""0"2"0""https://toolbox-piee.eb.mil/"0"link""1""2026-11-06T15:57:50.023+00:00""13700515d99440cd9be9ce412b04ccb1""public""0""Department of Defense Procurement Toolbox""public""9c25645ee7c14ab0b8daa595f628c07f""0"1"0"Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 4de1cb6926904edd8a7588b8cf57ff1a), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.