Amendment 0001
The contractor shall provide all labor, materials, equipment, supervision, and coordination necessary to complete the following work: (1) Site verification of existing conditions and dimensions; (2) Demolition of OR flooring including base cove (approximately 1,600 square feet total); (3) Installation of new resinous flooring (650 sf in OR5, 660 sf in OR6, 140 sf in Room 2-320, 70 sf in Room 2-321) and integrated 4-inch cove base per VA Specification 09.67.23.40; (4) Demolition of 3rd floor bathroom including walls required for plumbing connections; (5) Construction of new walls integrated with existing building conditions; (6) Installation of new wall-hung toilets with supply and waste line plumbing compliant with NJ plumbing codes; (7) Sealing of floors and floor openings; (8) Installation of new floor tiles with proper substrate preparation, leveling, moisture verification, and finish matching existing conditions; (9) Patching, repair, finish restoration, and painting to match existing; (10) Relocation of all affected MEP systems (HVAC diffusers, light fixtures, fire sprinkler heads, electrical raceways); (11) Removal and reinstallation of ceiling systems required to access piping and ductwork; (12) Sealing of all interior wall and ceiling penetrations using approved firestop systems; (13) Disposal of materials and debris; (14) Provision of updated as-built documentation; (15) Testing, commissioning, and verification that all new systems are fully functional; (16) Warranty of all parts and labor for a minimum one year from final acceptance. Work will be performed in two phases: Phase I (bathroom work) over 30 calendar days and Phase II (flooring work compressed into a 9-day window when ORs are turned over to contractor Friday 8 PM through following Sunday 11 PM). All demolition in ORs and work in Room 2-220A must be performed after hours. Contractor must comply with VA Infection Control Risk Assessment (ICRA) requirements, protect adjacent areas from dust and debris, coordinate utility shutdowns, and maintain detailed scheduling and coordination with Medical Center staff.
We post new general contractors opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""12208""ALBANY""NY""USA""113 HOLLAND AVE""36C24226R0128 0001.docx"16761"file"".docx""1""2026-10-21T19:05:37.561+00:00""f6fbfd8191374673aaa4e12278aa578c""public""0""public""0407d497d5b144c3aaf2ae02e0fcfe37""0"7"0""VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx"16061"file"".docx""1""2026-10-19T19:00:51.744+00:00""fd20438493b54377a51d8759e94cb374""public""0""public""183ed45501ce42e8a72c3a929e141b20""0"6"0""FAR 52.225-2 BUY AMERICAN CERTIFICATE.docx"16346"file"".docx""1""2026-10-19T19:00:51.744+00:00""b93b166c54c9483aad70eccabc757ad8""public""0""public""fc000b51c6874c7ea0d309815ec533fa""0"5"0""Specifications - Project 561-26-104.pdf"2715680"file"".pdf""1""2026-10-19T19:00:51.744+00:00""ef9810b6957849bf92f27764f1d21333""public""0""public""f1cbd1e938694f418aa7df0ee4e70630""0"4"0""Drawings - Project 561-26-104.pdf"932950"file"".pdf""1""2026-10-19T19:00:51.744+00:00""bde112bc93804ba0ab2847d72b9e30a4""public""0""public""e7dfc51dac8a45bf8a3cd5c5a4fe4243""0"3"0""Wage Determinations.pdf"78595"file"".pdf""1""2026-10-19T19:00:51.744+00:00""61a620c066ff45aca5bcf5c6050ff364""public""0""public""a8206795965146aeb65ab630ee8728e3""0"2"0""36C24226R0128_1.docx"125938"file"".docx""1""2026-10-19T19:00:51.744+00:00""fa87db39f07149969d92275d1fe7b162""public""0""public""7ac983ec3285450585fd8ee78adfa05e""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 33f07461c34f41bba4cdcfa16df21219), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.