PS-318: Reconstruction of Paerdegat Pumping Station Paerdegat pumping station is located in Brooklyn, New York at 6002 Flatlands Ave, Brooklyn, New York that flows to the Coney Island Wastewater Resource Recovery Facility. The Pumping Station was constructed in 1932 with an upgrade completed in 1995. The station currently has a designed flow capacity of 57 million gallons per day (MGD) wet weather flow and 22.8 MGD dry weather flow. The existing station is in need of State of Good Repair (SOGR) upgrades in order to improve compliance with DEP’s SOP’s and design guidelines. Specifically, areas needing SOGR improvements include replacing existing pumps, placing wet well elevation monitoring system, new mechanical, HVAC, electrical, I&C systems, resiliency upgrades, provide permanent emergency fuel generator and fuel storage, replace crane electrification system, rehab wet well structure, reconstruction of floors, walls, and ceilings, replace clay tile and membrane roofing, replace building façade walls, windows, floors, and brick fence, replace plumbing and fixtures in bathroom, replace existing force main, install new parallel force main, extend spillway, replace the gate wall thimbles, constructing two influent chambers for emergency bypass system, install cameras for remote monitoring, relocation of station identification sign, and replace of vintage wood gate. For the purposes of this report and for internal NYCDEP coordination, all references to the pumping station will refer to the Paerdegat pumping station to be consistent with the PS-DES-5 contract language. Paerdegat is owned and operated by the New York City Department of Environmental Protection (NYCDEP) Bureau of Wastewater Treatment (BWT) This Competitive Sealed Bid (“RFx") is being released through PASSPort, New York City’s online procurement portal. Responses to this RFx should be submitted via PASSPort. To access the solicitation, vendors should visit the PASSPort Public Portal Navigator at https://passport.cityofnewyork.us/page.aspx/en/rfp/request_browse_public. This will take you to the Public Portal of all procurements in the PASSPort system. To quickly locate the RFx, insert the EPIN 82626B0054 into the Keywords search field. If you need assistance submitting a response, please contact MOCS Service Desk: mocssupport.atlassian.net/servicedesk/customer/portal/8
Estimated value: $85,355,828.00. Questions due: 11/18/2026. Contract term: 2/17/2027 – 3/3/2030
The contractor shall provide all labor and material for the reconstruction of the Paerdegat Pumping Station, including replacing existing pumps, installing a wet well elevation monitoring system, new mechanical, HVAC, electrical, and I&C systems, resiliency upgrades, a permanent emergency fuel generator and fuel storage, replacing the crane electrification system, rehabilitating the wet well structure, reconstructing floors, walls, and ceilings, replacing clay tile and membrane roofing, replacing building façade walls, windows, floors, and brick fence, replacing plumbing and fixtures in the bathroom, replacing the existing force main, installing a new parallel force main, extending the spillway, replacing gate wall thimbles, constructing two influent chambers for an emergency bypass system, installing cameras for remote monitoring, relocating the station identification sign, and replacing the vintage wood gate.
We post new general contractors opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: NYC PASSPort (RFx 37817), retrieved via the NYC PASSPort procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.