The purpose of this project is to renovate two Cystoscopy rooms (214 and 215), Procedure Room (212), Procedure Room (211), Check-In area, Office, Control, Vestibule, Dressing, Toilet and Corridor. The two Cystoscopy rooms (214 and 215) will also receive new medical equipment.
The Buffalo VAMC requires a Contractor to perform construction work necessary to accomplish this goal. The anticipated Construction Period of Performance is estimated to be 720 days.
This effort intends to perform site preparation renovations to support the installation of new medical equipment. The Contractor shall prepare rooms 214 and 215 to receive new equipment. A control room (215-1) is included and an electrical room (214-1) with new electrical panels and equipment is included in the design. In addition, Procedure Rooms 212 and 211, a stretch alcove, a check-in area, office, dressing area and restroom are included in this scope of work
The Contractor shall prepare rooms 214 and 215 to receive new medical equipment, including a control room (215-1) and an electrical room (214-1) with new electrical panels and equipment. The scope also includes Procedure Rooms 212 and 211, a stretch alcove, a check-in area, office, dressing area, and restroom. Work encompasses demolition, structural steel framing, metal fabrications, rough and finish carpentry, thermal insulation, firestopping, joint sealants, hollow metal doors and frames, interior wood doors, integrated door assemblies, access doors, door hardware, automatic door operators, glazing, subsurface preparation for floor finishes, non-structural metal framing, gypsum board, acoustical ceilings, resilient base and accessories, resinous poured in place resilient flooring, painting, signage, wall and door protection, toilet and bath accessories, fire extinguisher cabinets, manufactured metal and wood casework, countertops, radiation protection, wet-pipe sprinkler systems, plumbing, HVAC, electrical installations, communications, and electronic safety and security systems.
We post new general contractors opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""12208""ALBANY""NY""USA""113 HOLLAND AVE""36C24226B0065 0001.docx"23572"file"".docx""1""2026-10-20T18:24:33.348+00:00""458ad113ab9944e182f44b1f162400b4""public""0""public""4cd617810218486a879bb3af07525eaa""0"6"0""FAR 52.225-2 Buy American Certification.pdf"127626"file"".pdf""1""2026-10-19T17:55:33.72+00:00""8383f9fec3fc4bd2831f48da20c928c3""public""0""public""aa62fa3f02f84a4a8e610befa5b2611e""0"5"0""UPDATED-528-19-102-BuffaloUrology Combined Specifications 05-18-2026.pdf"13011711"file"".pdf""1""2026-10-19T17:55:33.72+00:00""d604bcb2b94f4c90aab273da7fedda87""public""0""public""c8f9ff789251473e808051cdbedead5b""0"4"0""Facility Approved Finishes and Devices.pdf"89796"file"".pdf""1""2026-10-19T17:55:33.72+00:00""ebec78cfefa44bada336b3105daa29f6""public""0""public""41f7e912fd7a497a9f97a652e2141c92""0"3"0""UPDATED- Final Construction Drawings-2_01.pdf"84277365"file"".pdf""1""2026-10-19T17:55:33.72+00:00""12e30c9e349d4717a265927c68360868""public""0""public""c1a1fa3af1bf44d58aa6f3a9fa9e2a9d""0"2"0""36C24226B0065_1.docx"7061072"file"".docx""1""2026-10-19T17:55:33.72+00:00""bf084085a82e48729985df40a9d6e428""public""0""public""0167f957173649dea564f8480cc17f20""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice ee6285b153234cda8c6c7e99b03840d7), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.