Please see amendment 0001 document.
The work includes general construction, demolition and removal of existing structures, and construction of new systems. Mechanical/plumbing work includes dead leg removal, installation of automatic flushing faucets, temperature sensors, check valves, flow meters, mixing valves, pressure sensors, water monitoring panels, sub-micron legionella filters, insulation, valve replacement, and water monitoring equipment. Electrical work includes connections, devices, panels, conduits, and wiring for equipment. The project also includes removal/remediation of asbestos containing materials and lead based paint. Two deduct alternates are included: Alternate 1 omits certain pressure and temperature sensor installations in Building 1, and Alternate 2 omits certain demolition and installation work in Building 12.
We post new plumbing opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""98662""VANCOUVER""WA""USA""5115NE 82ND AVE""SUITE 102""668-22-106 Site Visit Roster.pdf"115837"file"".pdf""1""2026-10-27T19:07:31.094+00:00""a6d534040552493895ff59f5448530bc""public""0""public""d4f9c052f71e47309f45008caef6ea35""0"18"0""36C26027R0014 0001.docx"17829"file"".docx""1""2026-10-27T18:58:12.024+00:00""b4922ef248aa41ee9b56c9cdd52ecb68""public""0""public""bffcdf8aa9794017a143408ea468efc6""0"17"0""Attachment 13 - 668-22-106 - Site Visit Area Map.pdf"228823"file"".pdf""1""2026-10-19T17:47:12.555+00:00""cef1eca7acaa41f5880893839f39631a""public""0""public""371c922af65142cd948ea59cc763a423""0"16"0""36C26027R0014.docx"293749"file"".docx""1""2026-10-14T20:58:58.57+00:00""d51cf45f9d214ccea4ca5f6beb18c31b""public""0""public""0e43386e9cfc47bcb908aec26808fe2d""0"15"0""Attachment 2 - 668-22-106_Construction - Drawings.pdf"106413942"file"".pdf""1""2026-10-14T19:39:28.396+00:00""f295f3641a344df6bf906f55e64dd044""public""0""public""a18ed9f264fc42b7853dd9d176ace083""0"14"0""Attachment 4 - 668-22-106_PCRA_Pre-Construction Risk Assessment Checklist ver6.pdf"1143590"file"".pdf""1""2026-10-14T19:08:33.272+00:00""2de6b9c8ea794360b1f5eebf5a79de8b""public""0""public""8cadb421fba748f6a55d93b057d11cc5""0"13"0""Attachment 6 - 668-22-106_ICRA_VHA ICRA 2023-1_Type B_Level3.docx"146636"file"".docx""1""2026-10-14T19:08:33.272+00:00""a865cbff604e4bb4a9c147aacaf28b42""public""0""public""b3de4a90c3a94f71a0fee7305e69b82c""0"12"0""Attachment 8 - 668-22-106 - Limitations on Subcontracting-Construction.doc"123040"file"".doc""1""2026-10-14T19:08:33.272+00:00""3e7e9303a5604083aa7f771d5b4c138a""public""0""public""66bfb97a8a3645d8a309471f502969ab""0"11"0""Attachment 10 - 668-22-106 - Past Performance Questionnaire.docx"115123"file"".docx""1""2026-10-14T19:08:33.272+00:00""0c93390683ed4acb9ddc39433d45de41""public""0""public""f01fd5eb83c2419cbabfc52cb2c98e34""0"10"0""Attachment 12- 668-22-106 Wage Determination.pdf"48122"file"".pdf""1""2026-10-14T19:08:33.272+00:00""0da35c6fa43a4a38a95c38cbd0d11d84""public""0""public""931b8f65c12d42eb8bf6e1dbe9bc3155""0"9"0""Attachment 1 668-22-106_Construction - SOW R2.pdf"189782"file"".pdf""1""2026-10-14T19:08:33.272+00:00""8450395fb7354508a3f1d171803ecb27""public""0""public""2a2b18b5a4d74ec7a46a6dfc7827c252""0"8"0""Attachment 3 - 668-22-106_Construction - Specifications.pdf"3593616"file"".pdf""1""2026-10-14T19:08:33.272+00:00""cad7fbaf7cc44dab90bf916024bf4126""public""0""public""dfec488df082456d9dd1c4a2e72ed191""0"7"0""Attachment 5 - 668-22-106_ICRA_VHA ICRA 2023-1_TypeA_Low-High_Risk.docx"147941"file"".docx""1""2026-10-14T19:08:33.272+00:00""545167db0fea4761a08c23aaaabdd6ab""public""0""public""499087cc5336428f81ce8645858a558b""0"6"0""Attachment 7 - 668-22-106_ICRA_VHA ICRA 2023-1_TypeB_HighestRisk_SPOIC_Edited.docx"147787"file"".docx""1""2026-10-14T19:08:33.272+00:00""f30bdfc5168a4d8fa22422e1e6f9ff72""public""0""public""f91f4c353aa547ef89b201c65bc54634""0"5"0""Attachment 9 - 668-22-106 - Contractor Rules of Behavior.pdf"183302"file"".pdf""1""2026-10-14T19:08:33.272+00:00""65afab5556c7479a90c94f44137e8149""public""0""public""95aaf53d582248369c0091f7d837231b""0"4"0""Attachment 11 - Price Schedule Breakdown.xlsx"14347"file"".xlsx""1""2026-10-14T19:08:33.272+00:00""b67025e8a43d4e08bdf7df568b10dc51""public""0""public""0fdf4968c0ba473aa2664025bd76a9af""0"3"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 2c1b9581616c4bc68b74ca431e1a1070), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.