642-22-104, 36C24426R0088, Upgrade Substation Building 2, Phase 1, PHL CMCVAMC
Proposal Due Date: 11/20/2026 at 4:00pm EST. Email proposals to Kevin Rodgers at kevin.rodgers2@va.gov.
This project will replace Electrical Substations 1 and 2 with new 480/277V substations each containing a 1500 kVA transformer.
The contractor shall replace existing Electrical Substations 1 and 2 with new 480/277V substations each containing a 1500 kVA transformer. A temporary 480/277V substation with a 1500 kVA transformer shall be installed to maintain electrical service during demolition and construction, and shall remain as a spare upon completion. Work includes demolition and removal of existing substation materials, replacement of feeders, transformers, and control systems, and installation of a new HVAC cooling system for the electrical room. The contractor must perform a complete arc flash hazard analysis, load monitoring, and site assessment. All work shall be phased to minimize service outages and maintain continuous operation of the medical center, with electrical shutdowns conducted during off-hours (8:00 p.m. to 6:00 a.m.). The contractor must also provide and install a permanent manometer for negative pressure monitoring, comply with ICRA requirements, and submit a baseline CPM construction schedule.
We post new electrical opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""15215""PITTSBURGH""PA""USA""1010 DELAFIELD ROAD""36C24426R0088 0003.pdf"100294"file"".pdf""1""2026-10-27T11:48:23.614+00:00""d1f5fd2c8a79454aa7b67929ab679832""public""0""public""9c6a94f128e441febceecffdf3514e62""0"13"0""Attachment 1 RFI 1 Upgrade Substation 642-22-104.docx"29075"file"".docx""1""2026-10-23T13:44:43.14+00:00""ecb73559690941449adedb0f503a5fb5""public""0""public""a5c714a9e96c4124911f6ec6d6f3a732""0"12"0""36C24426R0088 0003.pdf"100287"file"".pdf""1""2026-10-23T13:44:43.14+00:00""d42133a281bd49528a10db62c4980c00""public""2026-10-27T11:48:23.614+00:00""1""public""e48be773c7e54e1e914b0195cf1dc4e2""0"11"0""2026-10-27T11:48:23.614+00:00""Attachment 3 General Decision Number PA20260003 10012026.docx"28560"file"".docx""1""2026-10-22T19:08:55.797+00:00""483872d42a6c4f9c8fae6c95e9cdf8e0""public""0""public""11bdd77a813441c287291c567510485c""0"10"0""Attachment 2 P09 Final SOW Rev1 Building 2 Substation Phase 1 642-22-104 10202026.docx"50819"file"".docx""1""2026-10-22T19:08:55.797+00:00""811d2ee97299409792b08897faa3e5a6""public""0""public""9c6ee481cf18476eb4c22e026701402f""0"9"0""36C24426R0088 0002.docx"120710"file"".docx""1""2026-08-31T11:59:06.152+00:00""38f3a35d8e8f43ae861cb79b67ec8ba0""public""0""public""2a0bc7457ce34444a7e03f5ee9d879c6""0"6"0""36C24426R0088 0001.docx"122058"file"".docx""1""2026-08-04T18:56:49.287+00:00""6e059744bec743c2aadf2665558a06ba""public""0""public""f869100ea8fc40ae90d92ff6426c1ec1""0"5"0""S04 Pre-Bid Sign-In Sheet 36C24426R0088 - 642-22-104 - Upgrade Substation.pdf"109334"file"".pdf""1""2026-08-04T18:56:49.287+00:00""e5659aa25f0f41fdbf37352f6886c5b5""public""0""public""209276d476c143d6a5dc0c92ff113279""0"4"0""Substations Upgrade Building 2-Phase 1_Bid Documents_Specification_10-21-24.pdf"2228585"file"".pdf""1""2026-07-02T21:31:05.943+00:00""15de5f9fe82d4361b39d6add7aafaeb5""public""0""public""5e74d537edc94235813e127d31b0d169""0"3"0""Substations Upgrade Building 2-Phase 1 Combined Drawings.pdf"38093199"file"".pdf""1""2026-07-02T21:31:05.943+00:00""4f18318e9e9b433e82fb1e2f588295f1""public""0""public""2a6407a4d7ce453f8991d0d0eaee428d""0"2"0""36C24426R0088_1.docx"160262"file"".docx""1""2026-07-02T21:31:05.943+00:00""eaae4f31654244009e8eb238eaf6f424""public""0""public""db8c2c8cbbd84fbcb9f523e9367f14e3""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 288ca1f380b04ba5b424aa359047a8f8), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.