Amendment 0004 - Bid Opening Due Date Change
Please note that solicitation #36C77626B0020 is related to the Sources Sought notice # 36C77626Q0137 which serves as the presolicitation.
In accordance with 15 USC 644, this project is a competitive small business set aside.
This project is located at:
Brooklyn VA Medical Center
800 Poly Place
Brooklyn, NY 11209
Please see attachements for additional details on this procurement.
The contractor shall completely prepare the site for building operations, including demolition and removal of existing structures, and furnish labor and materials to perform work for the Upgrade Life Safety/Critical Branch Electrical Distribution. The project tasks are broken into three categories: the first category (Task Nos. 1, 2, and 3) is to install a dedicated life safety branch in the VA Brooklyn campus's Building 1, including automatic transfer switches (ATS) and electrical distribution equipment on each floor with loads dedicated to the life safety branch for compliance with NFPA 70, NFPA 99, and NFPA 110, and VA electrical design requirements for a healthcare facility essential electrical system. The second category (Task No. 5) addresses electrical distribution equipment that requires upgrade and/or replacement to exceed the expected three-phase asymmetrical fault current as determined by a previous Schweitzer Engineering Laboratories, Inc. (SEL) electrical study. The third category (Task Nos. 6 through 26) addresses equipment code violations that were determined during a previous SEL electrical study. The work is to be performed at the Brooklyn VA Medical Center, 800 Poly Place, Brooklyn, NY 11209, and includes work in Buildings 1, 2, 4, 14, and 15.
We post new electrical opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""44131""INDEPENDENCE""OH""USA""6150 OAK TREE BLVD""SUITE 300""36C77626B0020 0004.pdf"185266"file"".pdf""1""2026-10-27T19:00:31.209+00:00""6512117b21904a909e885ff1049fcc57""public""0""public""6ebc124f391040bab545129b8c8430bd""0"14"0""36C77626B0020 0003_1.pdf"185348"file"".pdf""1""2026-10-22T22:56:55.401+00:00""a8c1a4879da742b2a42a0452822ab58a""public""0""public""1fef1538ee264f4a8f7c624fa489c2bf""0"13"0""S04 - Site Visit Sign In Sheet - Signed.pdf"165301"file"".pdf""1""2026-10-22T22:56:55.401+00:00""eaa01f1493094fca98a4d9386d2318f8""public""0""public""9dff423960aa4c509dfdf70948703477""0"12"0""36C77626B0020 0002.pdf"186937"file"".pdf""1""2026-10-14T22:29:29.567+00:00""0d816dbb9ba847f4b3758f8cd1926ce9""public""0""public""809a7883e48a4acc93b129b624ffb8c6""0"11"0""36C77626B0020 0001.pdf"187490"file"".pdf""1""2026-10-13T18:04:44.739+00:00""e6b074a23b064ae883bdc4120b312585""public""0""public""00b64f88830e4f37bf7389297e27bb43""0"10"0""Brooklyn VAMC Map.pdf"146585"file"".pdf""1""2026-10-06T19:04:32.713+00:00""850b802f62514ad3844d6e2822d948af""public""0""public""bd0543744bcf4c60bb3936a650049a86""0"9"0""36C77626B0020 Brooklyn VAMC Construction.pdf"692546"file"".pdf""1""2026-10-06T19:04:32.713+00:00""27b726c7f6344ec6bd7e19a7850b2320""public""0""public""bf3e708c35424f789e8deb19779cb67d""0"8"0""Attachment G - RFI TRACKING SHEET.xlsx"13550"file"".xlsx""1""2026-10-06T19:04:32.713+00:00""4cda4dd9d44e48d1810b9ae211d3e845""public""0""public""144ca5c9a4aa4fcbac52bd006e61ffc4""0"7"0""Attachment F - Site Visit Instructions.pdf"49135"file"".pdf""1""2026-10-06T19:04:32.713+00:00""dc2f2c4b75b6410e9472bb0eba05df04""public""0""public""61f1bc47700c4c84a4fe8e76225b4609""0"6"0""Attachment E - Wages Rates - King County 5-26-26.pdf"6578059"file"".pdf""1""2026-10-06T19:04:32.713+00:00""c96c2bff24874bd78b504e8dd8393146""public""0""public""8ce6838fb0a646de8a43de9b58e8d94f""0"5"0""Attachment D - Drawings.pdf"11763917"file"".pdf""1""2026-10-06T19:04:32.713+00:00""1d8ed78166214c3fa3152d7efa43b761""public""0""public""a147ab42d94745839e9660812b986542""0"4"0""Attachment C - Drawings.pdf"18034623"file"".pdf""1""2026-10-06T19:04:32.713+00:00""b3d29a7a0bfa42b7b0314886fe2deddd""public""0""public""e181b6faa8734ca2921053ef75e868d6""0"3"0""Attachment B - Drawings.pdf"12289301"file"".pdf""1""2026-10-06T19:04:32.713+00:00""e888942ce763414d9cc74f0d70ca7cb9""public""0""public""b26ee1cf16d3490da353ec1c6cb48424""0"2"0""Attachment A - Specifications - 3-11-26.pdf"7764540"file"".pdf""1""2026-10-06T19:04:32.713+00:00""465dd4d5530c48b6bd9ae7c2498a241c""public""0""public""3864737495a44719b08378488ef35e82""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 3c83d96403be4c3589fa0cd8b6c400eb), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.