All labor and materials to abate asbestos and reinsulate the steam piping when done
Provide all labor, supervision, materials, equipment, containment, protection, coordination, waste handling, disposal, reinsulation and closeout for asbestos pipe-insulation abatement in the Zone 6 air-handling-unit area. Remove approximately 10 linear feet of accessible asbestos-containing pipe insulation above the air-handling unit and one duct vibration cloth, establish regulated work area with 6-mil polyethylene, negative-pressure glove bags or full containment, HEPA negative-air equipment and decontamination, then clean the area for mechanical repairs by others. Coordinate shutdowns with the steam system below 150 degrees Fahrenheit and the air-handling unit shut down and locked out. After repairs, return and install 1-inch-thick fiberglass pipe insulation with factory-applied jacket, mineral wool at fittings, tees, elbows and transitions, and PVC protective fittings, sealed and fitted around existing hangers and saddles. Package wetted asbestos waste in double 6-mil bags, transport with authorized vehicles and dispose at an approved facility, with manifests, clearance reports, product data and daily records submitted at closeout.
We post new insulation opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Missouri work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Required by the city at the permit stage, not with your bid. Inferred from where the work happens — confirm forms and amounts with the permit office before you start.
Source: City of St. Louis (solicitation 2027BID000060), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.