Argonne National Laboratory (ANL) seeks a Contractor for On-Site Industrial Services. Services include abatement, scaffolding, floor tile removal, window replacement, glazing removal, insulation, and surface preparation and coatings.
Award will be made on a BEST VALUE basis. Technical acceptability will be evaluated on AN ADJECTIVAL SCALE. BUSINESS PROPOSALS WILL BE EVALUATED ON PASS/FAIL. Among responsible offerors determined technically acceptable and compliant with solicitation requirements, **ANL will award to the offeror with the best overall value, where the Technical Proposal is of greater importance to the Price Proposal and Business Management Proposal. **
Proposals are due by 10:00 AM CST on December 7, 2026.
*All inquiries or questions must be submitted in writing prior to 3:00 PM CST on November 27, 2026.
Offerors shall submit:
Completed proposal that meets the requirements stated in the Request for Proposal Document (Technical Proposal, Business/Management Proposal, and Price Proposal)
Completed and signed ANL-70B Representations and Certifications.
Any proposed exceptions or deviations.
All proposal documentation requested under Best Value Evaluation Criteria (Enclosure 5)
Offers that do not meet mandatory requirements or do not provide adequate supporting documentation may be found technically unacceptable.
The contractor shall provide all labor, materials, equipment and expertise for insulation installation, repair and removal, abatement of asbestos, lead and mold with containment, removal and clearance testing, engineered scaffolding erection and dismantling, floor tile removal including asbestos-containing tile, window removal and replacement and glazing removal, and surface preparation and coating of piping, vessels, tanks, structural steel, floors and concrete, performed on an as-ordered basis through Call Records or Service Requests at Argonne National Laboratory with quotes, work plans, abatement and coating records and closeout reports required.
We post new insulation opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""60439""Lemont""IL""USA""9700 S. Cass Ave""Enclosure No 1 - Request for Proposal - 7-B187-Q-00016-00.pdf"256021"file"".pdf""1""2026-11-16T19:54:35.015+00:00""af54154ce858432fbb0377e6acf1f25a""public""0""public""075ec8c443b84506ac5d1ea47c9d397c""0"9"0""Enclosure No 2 - Appendix A-Labor Hour-12-OCT-2026 - 7-B187-P-00016-00.pdf"3248015"file"".pdf""1""2026-11-16T19:54:35.015+00:00""22347f68fbf64a4d8a450d3b29c4c226""public""0""public""7d7c595dccca4c09b6b4b270c3543d68""0"8"0""Enclosure No 3 - Statement of Work - 7-B187-Q-00016-00.pdf"173201"file"".pdf""1""2026-11-16T19:54:35.015+00:00""f818e1bdf82b44a192e96d3c51e9a206""public""0""public""1c897edee89f4c548c6a92b7fab1c45c""0"7"0""Enclosure No 4 - ANL-366H (on-site high risk)-23-OCT-2026 - 7-B187-P-00016-00.pdf"339977"file"".pdf""1""2026-11-16T19:54:35.015+00:00""597e3568924b43cb954746ef091824ea""public""0""public""7f9e11e75fc74570985b8c0f4f7aebe3""0"6"0""Enclosure No 5 - Evaluation Criteria - 7-B187-Q-00016-00.pdf"187520"file"".pdf""1""2026-11-16T19:54:35.015+00:00""bd5bd97e18e349acb2c610e8e4d52715""public""0""public""030842d2510e4e748679c45b8f5b1934""0"5"0""Enclosure No 6 - ANL-70B Reps and Certs Long-29-SEP-2026 - 7-B187-P-00016-00.pdf"416911"file"".pdf""1""2026-11-16T19:54:35.015+00:00""1379b51148df4305929bb9e3b8d2d763""public""0""public""b32e9bb848654219a2ba739226c6dd1a""0"4"0""Enclosure No 7 - SCA WD 2015-5017 Rev 34 - 7-B187-P-00016-00.pdf"75780"file"".pdf""1""2026-11-16T19:54:35.015+00:00""50122f8ce1d34cf8b2053ad52e76edae""public""0""public""0a6ae6c1feb542a39889710f239429bd""0"3"0""Enclosure No 8 - Price Schedule - 7-B187-Q-00016-00.pdf"120976"file"".pdf""1""2026-11-16T19:54:35.015+00:00""ed55592659184c1cbf745495abfe0bea""public""0""public""9483ad8fc98844d58d06628878b2342e""0"2"0""Enclosure No 9 - SCA Wage Flyer 2009 - 7-B187-Q-00016-00.pdf"126411"file"".pdf""1""2026-11-16T19:54:35.015+00:00""f378d99c33a949adafcdb53efce0094e""public""0""public""129bbd74bde9448591d9151fbcb2a4c3""0"1"0"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 9e232aff7af94a808a6740c250b8bd0e), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.