This requirement is for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 30 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand.
Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach.
The contractor must provide hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows capable of dredging to a depth of 30 feet, complete with crew, management staff, and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material to be dredged is maintenance material typical for Pensacola Entrance Channel composed of sand, and the dredged material will be placed west of the Pensacola Entrance Channel along Perdido Key Beach.
We post new excavating opportunities in Alabama as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"36628-0001""MOBILE""AL""USA""KO CONTRACTING DIVISION""109 ST JOSEPH ST""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9127827BA002¬iceType=SolicitationNotice"0"link""1""2026-11-06T19:25:08.536+00:00""3570ceaca25f40bd949c9dc957d5b223""public""0""PIEE Solicitation Module Link for W9127827BA002""public""dd0ff15e675e424198d4d27ec76e0e68""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-11-06T19:25:08.536+00:00""7d0635cd7cd84f7eb2b27f12eb2c601d""public""0""Web Based Training for the PIEE Solicitation Module""public""19613d9e267c4227862d4dd9c0d22e80""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-11-06T19:25:08.536+00:00""5a4f6c38df3f435a80770090442bd6c2""public""0""Registration Instructions for the PIEE Solicitation Module""public""a16371e82f034bc095b63bf4e63688ad""0"2"0""https://toolbox-piee.eb.mil/"0"link""1""2026-11-06T19:25:08.536+00:00""cd71add0f960476ca4249a8f6940861f""public""0""Department of Defense Procurement Toolbox""public""9ab015a955e8424eb52820c84d04a572""0"1"0"Most Alabama work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 11ffa88a09634d9fbb977f3bdd069c72), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.