Perform surveying, dredging and disposal of approximately 900,000 cubic yards of fine-grained shoaled material annually for three (3) years at the Anchorage Harbor with an option to annually dredge 350,000 cubic yards of sandy material with some cobbles in Cook Inlet Navigation Channel. The dredging must be accomplished in a manner that keeps the Port of Alaska dock face and terminals accessible for shipping traffic at all times. The Cook Inlet Navigation Channel, which is the marked entrance through Knik Arm Shoal to Anchorage Harbor, may also require periodic maintenance dredging.
The contractor is to furnish all labor, equipment, supplies, materials, supervision and other items and services necessary to accomplish the work.
Perform surveying, dredging and disposal of approximately 900,000 cubic yards of fine-grained shoaled material annually for three years at Anchorage Harbor, with an option to annually dredge 350,000 cubic yards of sandy material with some cobbles in the Cook Inlet Navigation Channel, keeping the Port of Alaska dock face and terminals accessible for shipping traffic at all times and furnishing all labor, equipment, supplies, materials, supervision and other items and services necessary.
We post new excavating opportunities in Alaska as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"99506-0898""ANCHORAGE""AK""USA""CONTRACTING OFFICE KO""2204 3RD STREET""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911KB27RA002¬iceType=SolicitationNotice"0"link""1""2026-11-05T21:34:36.611+00:00""449785c3f2e04e22a1deab35967849a5""public""0""PIEE Solicitation Module Link for W911KB27RA002""public""3c0892c753f545ca8ea46cd917e512a4""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-11-05T21:34:36.611+00:00""a523b98d748b45d294d56bf0715f45cc""public""0""Web Based Training for the PIEE Solicitation Module""public""d9d878a9c5c542138e8cd45208dd8f42""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-11-05T21:34:36.611+00:00""0864e32f52fc4dd9972d93d150c65aba""public""0""Registration Instructions for the PIEE Solicitation Module""public""4fde6df87fdc48af9c5fbfddbef8a464""0"2"0""https://toolbox-piee.eb.mil/"0"link""1""2026-11-05T21:34:36.611+00:00""3e04ef6c31db4f99a3c76b479ccc193c""public""0""Department of Defense Procurement Toolbox""public""6e46581389e0435396475f2284f086ef""0"1"0"Most Alaska work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice ef66c7cd4acc46e88c758a201c077566), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.