The U.S. Army Corps of Engineers - St. Paul District is seeking a contractor to perform groundwater monitoring services in support of the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, MN in Wabasha County. This solicitation is 100% set-aside for small business under NAICS 541380 with a size standard of $19 million. The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027.
During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site.
Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer. Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion.
All questions should be submitted in writing via the PIEE module Q and A section. Offers should be submitted via the PIEE Module. Click the first link in the Attachments/Links section.
The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027. During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site. Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer. Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion.
We post new other opportunities in Minnesota as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"55101-1678""SAINT PAUL""MN""USA""KO CONTRACTING DIVISION""332 MINNESOTA STREET SUITE 1500""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912ES27QA013¬iceType=SolicitationNotice"0"link""1""2026-11-03T13:38:23.451+00:00""67178598974846faab1b6336a3955d5a""public""0""PIEE Solicitation Module Link for W912ES27QA013""public""f9b6f49c4b454bc380bb0fc32a687347""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-11-03T13:38:23.451+00:00""6fe6cfe8af6a41caab5e2c5b77ae3521""public""0""Web Based Training for the PIEE Solicitation Module""public""90b704f54177460383dbd0ae6ab5bed0""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-11-03T13:38:23.451+00:00""d915c968aabf447b972ed237a17cb949""public""0""Registration Instructions for the PIEE Solicitation Module""public""8a7fbd15a95a4d28982f284a6767ceee""0"2"0""https://toolbox-piee.eb.mil/"0"link""1""2026-11-03T13:38:23.451+00:00""a2a26f7b0e6f4a2daebbbc964c982274""public""0""Department of Defense Procurement Toolbox""public""4fd0525f1d204c51a6133fa33fcfd5ec""0"1"0"Most Minnesota work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0d0a1ed3b2c2491580e2bdad7424c517), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.