Contracts for a new HTRW MATOC pool are anticipated to be awarded to a minimum of three small contracts and up to three unrestricted contracts with a total value of up to $49,000,000.00. The location of the work to be performed under this contract shall be primarily in the six New England states but will also include other states and districts within the North Atlantic Division mission area. The work may involve performing Site Inspections, Remedial Investigations, Feasibility Studies, Proposed Plans, Records of Decision, Engineering Evaluation and Cost Analysis, Remedial Designs, Removal Designs, Removal Actions, Interim Removal Actions, and/or Remedial Actions at HTRW sites that are being addressed through the U.S Environmental Protection Agency (USEPAs) Superfund Program, the Department of Defense (DoDs) Base Realignment and Closure Program (BRAC) and Defense Environmental Restoration Program (DERP) Formerly Used Defense Sites (FUDS) Program, and other Interagency Support Customers. HTRW work performed for USACE must generally comply with the DERP statute [10 United States Code (USC) 2700 et seq.], the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) 42 USC 9601 et seq., Executive Orders (EOs) 12580 and 13016, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP), and all applicable DoD and Army policies.
The contracts cover CERCLA-phase work from preliminary assessments, site inspections, remedial investigations, feasibility studies, proposed plans and records of decision through engineering evaluations, remedial and removal designs, removal and remedial actions, long-term operation and maintenance and five-year reviews, including work plans, UFP-QAPPs, conceptual site models, environmental sampling of soil, sediment, groundwater, surface water and air, geotechnical and geophysical investigations, surveying, GIS, data management and validation, groundwater modeling, fate and transport assessment, human health and ecological risk assessment, preparation of plans, specifications, design analyses, MII or RACER cost estimates and P6 or MS Project schedules, value engineering, sustainability documentation, hazardous building materials surveys, community outreach and construction-phase services in compliance with DERP, CERCLA, Executive Orders 12580 and 13016, the NCP and DoD and Army policies.
We post new other opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"01742-2751""CONCORD""MA""USA""KO CONTRACTING DIVISION""696 VIRGINIA ROAD""Synopsis.pdf"687209"file"".pdf""1""2026-10-29T19:20:48.883+00:00""53fb3492106f4d9e976d024fdbe30180""public""0""public""d7d68cdaba2b4385b9d6627f64ec1005""0"6"0""Attachment A - Task Order Requirement Notice.pdf"326269"file"".pdf""1""2026-10-29T19:20:48.883+00:00""ce29dcf106794ce8aa83ff4ac2602134""public""0""public""b95da8372bc8423dbd17ca474ff4a08d""0"5"0""Attachment B - PPQ.pdf"254406"file"".pdf""1""2026-10-29T19:20:48.883+00:00""a1b15df7e6d04df2a8cfae185bbc71bf""public""0""public""bd29024652164cb69c0cd662ab6324d4""0"3"0""Attachment C - Joint Venture Procedure.pdf"177569"file"".pdf""1""2026-10-29T19:20:48.883+00:00""4ee6034fb81b4855a6a0cf80a79604e6""public""0""public""f0de97fbcd6845e8b3dd4ce5bb462f38""0"2"0""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912WJ27RA001¬iceType=SolicitationNotice"0"link""1""2026-10-29T19:18:35.873+00:00""56c58c3a52c6491abf24d907aad62482""public""0""PIEE Solicitation Module Link for W912WJ27RA001""public""9c8b0f99e44443d79b6d07df30c319f6""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-10-29T19:18:35.873+00:00""d04e62362e68426ea327ec511f8aafeb""public""0""Web Based Training for the PIEE Solicitation Module""public""2f6051236d864bf49de31c1105ce39d1""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-10-29T19:18:35.873+00:00""0e17958fef83485497cb22261599e490""public""0""Registration Instructions for the PIEE Solicitation Module""public""1cd480b8b3a446688bb317b00ca38d56""0"2"0""https://toolbox-piee.eb.mil/"0"link""1""2026-10-29T19:18:35.873+00:00""9d3b4bcf544e42e588d09ab5d49cb0a3""public""0""Department of Defense Procurement Toolbox""public""65416a78e55e49db85419225f850f58a""0"1"0"Most Massachusetts work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice ee7155c1788c47f39fa297d119412656), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.