Before you cut, excavate, or place utilities in the RIDOT state-highway right-of-way, the Department requires a performance bond on file as a condition of your physical alteration or utility permit. RIDOT sets the amount; we issue it at a flat 3% with no credit check — enter your figure and the premium updates.
















No underwriting queue for the standard right-of-way bond — enter your amount, pay, and file with RIDOT. Here is the whole thing:
Your business details, the bond amount RIDOT required, and an effective date — that is the entire application.
No credit check and no waiting — the executed bond is generated as soon as you pay. Larger amounts may get a quick review.
Submit the executed bond with your physical alteration or utility permit application so RIDOT can issue the permit. Wet-ink originals mailed whenever the Department insists.
Bond amount × 3% = your premium, one-time, $275 minimum. Enter the figure RIDOT set on your permit and the premium updates.
Any work that touches the RIDOT state-highway right-of-way — excavation, grading, pavement cutting, driveway or curb cuts, or placing utilities like power, fiber, water, sewer, or gas — needs a RIDOT permit. The Department conditions the physical alteration permit (PAPA) and utility permit on a performance bond filed before work begins.
The bond is a performance and restoration guarantee: if the permittee damages roads, curbs, traffic signals, or utilities and fails to repair them, or leaves the right-of-way unrestored, RIDOT can draw on the bond to cover the cost of putting the right-of-way back in proper condition.
RIDOT sets the amount based on the scope and restoration cost of your project, under its State Highway Right of Way regulations and utility-accommodation rules. It is not insurance for you — if the surety pays, you repay the surety. Enter the figure RIDOT named, and we issue at a flat 3% with no credit check.
Submit the application with the bond amount RIDOT set — the executed right-of-way bond is generated instantly, ready to file with your permit.
Start the application →If yours isn't here, the bond team can usually answer within the hour.
Five-minute application, flat 3%, $275 minimum. Enter the amount RIDOT required and file the same day.