Earth-change work inside the City of Pontiac falls under Part 91 of the Natural Resources and Environmental Protection Act (1994 PA 451, as amended), administered for Pontiac by the Oakland County Water Resources Commissioner. When a Soil Erosion and Sediment Control (SESC) permit requires a performance bond, the Commissioner sets the amount to the scope of your project; premiums cost 2% of the bond amount, $100 minimum, and the application includes a credit consent that authorizes a soft pull only.
















No long underwriting queue for the standard SESC permit bond — enter your amount, pay, and file with the county. Here is the whole thing:
Your business details, the bond amount the Water Resources Commissioner set on your Pontiac permit, and the effective date — that is the entire application.
The credit consent authorizes a soft pull only, and most permit bonds at this size issue as soon as you pay. Larger amounts may get a quick review.
Submit the executed bond with your Pontiac SESC permit application. Wet-ink originals mailed whenever the county insists.
The City of Pontiac does not administer its own soil erosion program; earth-change activity within Pontiac falls under Part 91 of the Natural Resources and Environmental Protection Act (1994 PA 451, as amended), which the Oakland County Water Resources Commissioner administers as the county enforcing agency for the city. A Soil Erosion and Sediment Control permit is required for an earth change disturbing more than one acre, or an earth change of any size within 500 feet of a lake, stream, wetland, or drain.
The bond is a performance guarantee that you will install and maintain the erosion and sediment control measures in your approved plan — silt fence, stabilization, inlet protection — for the life of your Pontiac project. If those measures fail or the site is abandoned unstabilized, the county can draw on the bond to complete the corrective work.
It is a three-party arrangement: you (the principal), the surety, and the permitting authority (the obligee), with adjacent property and waters of the state as the protected interest. It is not insurance for you — if the surety pays a claim, you repay the surety. Enter the amount your permit sets; premiums start from $100 and the application includes a credit consent authorizing a soft pull only.
These are the actual issuing fields, including the permit amount the Water Resources Commissioner set and a credit consent that authorizes a soft pull only.
Start the application →From $100, soft pull only. Enter your permit amount and file with the county the same day.